2022, 14(4): 74-85. doi: 10.16670/j.cnki.cn11-5823/tu.2022.04.12
徐家汇体育公园“两馆一建”BIM综合应用
上海建工五建集团有限公司,上海 200063 |
Comprehensive BIM Application of "Two Halls and One Construction" in Xujiahui Sports Park
Shanghai Construction Engineering Fifth Construction Group Co., Ltd., Shanghai 200063, China |
引用本文: 辛家舜, 王孙骏, 曹阳. 徐家汇体育公园“两馆一建”BIM综合应用[J]. 土木建筑工程信息技术, 2022, 14(4): 74-85. doi: 10.16670/j.cnki.cn11-5823/tu.2022.04.12
Citation: Jiashun Xin, Sunjun Wang, Yang Cao. Comprehensive BIM Application of "Two Halls and One Construction" in Xujiahui Sports Park[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(4): 74-85. doi: 10.16670/j.cnki.cn11-5823/tu.2022.04.12
摘要:上海市徐家汇体育公园“两馆一建”项目是改建与新建同时进行的公共体育项目用房,项目初建年代较早,图纸存在三个版本,对于BIM技术的应用实施是一次高难度的挑战。本项目将BIM作为工程项目管理和技术手段,包括协同设计、管线综合优化、深化设计、施工组织、进度管理和质量监控等,保证了项目的成功实施,提高了工程建设质量和项目综合管理水平。本文介绍了BIM技术在改建与新建交错施工项目中施工与管理方面的应用以及与三维扫描技术的结合。
Abstract: The "Two Halls within One Construction" project of Shanghai Xujiahui Sports Park is a public sports house that is reconstructed and newly built at the same time. The project was built earlier. There are three versions of the drawings. The application and implementation of BIM technology is a difficult challenge. This project uses BIM as a project management and technical means, including collaborative design, comprehensive optimization of pipelines and electrical lines, deepen the design, construction Organization, schedule management, quality control, etc.. To ensure the successful implementation of the project, improve the quality of project construction and the level of comprehensive project management. This article introduces the application of BIM technology in construction management in reconstruction and new construction projects. Also, this paper introduces how 3D laser scan technology can be combined.
[1] | |
[2] | |
[3] |
陶飞, 刘蔚然, 张萌, 等. 数字孪生五维模型及十大领域应用[J]. 计算机集成制造系统, 2019, 25(01): 1-18. |
[4] |
于晓娜, 韩琪. 浅析数字建筑的"三新"模式[J]. 四川水泥, 2018(04): 290.doi: 10.3969/j.issn.1007-6344.2018.04.277 |
[5] |
王泠一. 从徐家汇体育公园看地标是怎样炼成的[N]. 第一财经日报, 2021-02-24(A11). |
[6] |
白洁, 葛杰, 苗冬梅, 等. 大跨度钢结构施工用临时支撑体系的设置与优化[J]. 施工技术, 2016, 45(09): 17-20+52. |
[7] | |
[8] | |
[9] |
FARO Introduces As-Built Modeler The Fastest and Most Direct Path from Reality Data into any Design System[J]. M2 Presswire, 2019. |
[10] |
黄传浩. BIM设计在鞍山市体育中心游泳馆中的应用[J]. 土木建筑工程信息技术, 2010, 2(1): 47-52. |
[11] |
曹海良, 武雷, 佟昊芯. 基于BIM和三维激光扫描仪的GRG多曲面弧形吊顶材料验收[J]. 建筑施工, 2018, 40(01): 139-141. |
计量
- PDF下载量(47)
- 文章访问量(1956)
- HTML全文浏览量(826)