Citation: Jiashun Xin, Sunjun Wang, Yang Cao. Comprehensive BIM Application of "Two Halls and One Construction" in Xujiahui Sports Park. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(4): 74-85. doi: 10.16670/j.cnki.cn11-5823/tu.2022.04.12
2022, 14(4): 74-85. doi: 10.16670/j.cnki.cn11-5823/tu.2022.04.12
Comprehensive BIM Application of "Two Halls and One Construction" in Xujiahui Sports Park
Shanghai Construction Engineering Fifth Construction Group Co., Ltd., Shanghai 200063, China |
The "Two Halls within One Construction" project of Shanghai Xujiahui Sports Park is a public sports house that is reconstructed and newly built at the same time. The project was built earlier. There are three versions of the drawings. The application and implementation of BIM technology is a difficult challenge. This project uses BIM as a project management and technical means, including collaborative design, comprehensive optimization of pipelines and electrical lines, deepen the design, construction Organization, schedule management, quality control, etc.. To ensure the successful implementation of the project, improve the quality of project construction and the level of comprehensive project management. This article introduces the application of BIM technology in construction management in reconstruction and new construction projects. Also, this paper introduces how 3D laser scan technology can be combined.
[1] | |
[2] | |
[3] |
陶飞, 刘蔚然, 张萌, 等. 数字孪生五维模型及十大领域应用[J]. 计算机集成制造系统, 2019, 25(01): 1-18. |
[4] |
于晓娜, 韩琪. 浅析数字建筑的"三新"模式[J]. 四川水泥, 2018(04): 290.doi: 10.3969/j.issn.1007-6344.2018.04.277 |
[5] |
王泠一. 从徐家汇体育公园看地标是怎样炼成的[N]. 第一财经日报, 2021-02-24(A11). |
[6] |
白洁, 葛杰, 苗冬梅, 等. 大跨度钢结构施工用临时支撑体系的设置与优化[J]. 施工技术, 2016, 45(09): 17-20+52. |
[7] | |
[8] | |
[9] |
FARO Introduces As-Built Modeler The Fastest and Most Direct Path from Reality Data into any Design System[J]. M2 Presswire, 2019. |
[10] |
黄传浩. BIM设计在鞍山市体育中心游泳馆中的应用[J]. 土木建筑工程信息技术, 2010, 2(1): 47-52. |
[11] |
曹海良, 武雷, 佟昊芯. 基于BIM和三维激光扫描仪的GRG多曲面弧形吊顶材料验收[J]. 建筑施工, 2018, 40(01): 139-141. |
Metrics
- PDF Downloads(47)
- Abstract views(1954)
- HTML views(826)