2012, 4(4): 7-14.
大型项目BIM模型组织方法与实践
华中科技大学BIM工程中心,武汉 430074 |
广州优比建筑咨询有限公司,广州 510640 |
Methods of Manage the Large Project BIM Model
BIM Center, Huazhong University of Science and Technology, Wuhan 430074, China |
Ubiquitos Technology Co., Ltd., Guang zhou 510640, China |
引用本文: 何波. 大型项目BIM模型组织方法与实践[J]. 土木建筑工程信息技术, 2012, 4(4): 7-14.
Citation: He Bo. Methods of Manage the Large Project BIM Model[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2012, 4(4): 7-14.
摘要:大型项目BIM模型量大,需要有严格和有效的管理方法,才能确保BIM模型满足多专业、多人员可以有条不紊地协同工作,并遵循标准和规则确保模型的精度满足项目应用要求, 同时最小化建模的成本。除了通过传统的校审流程,还应利用软件工具检查BIM模型,以保障模型的质量以及采取相应的措施保障数据的安全。
Abstract: Large project BIM model amount is large, which require rigorous and effective management methods, to ensure that the BIM model satisfies architects, structure engineers, MEP engineers can work together everything in good order and well arranged, and follow the standards and rules to ensure that the model accuracy can meet the application requirement of the project, while minimizing the cost. Apart from the traditional review process, also should use software tools to check the BIM model, in order to ensure the quality of models and adopt corresponding measures to ensure data security.
[1] |
何关培新浪博客, http://blog.sina.com.cn/heguanpei. |
[2] |
何关培主编: 《BIM总论》. |
[3] |
Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston:《BIM Handbook》. |
[4] |
Los Angeles Community College District:《Building Information Modeling Standards》. |
[5] |
Hong Kong Housing Authority:《Building Information Modelling (BIM)Standards Manual》. |
计量
- PDF下载量(16)
- 文章访问量(1112)
- HTML全文浏览量(680)