• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Wang Qixing, Jia Zhangqin. Arc Piping Prefabrication and Assembling with Variable Curvature Base on the BIM Technology. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(3): 79-84. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.14

2017, 9(3): 79-84. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.14

Arc Piping Prefabrication and Assembling with Variable Curvature Base on the BIM Technology

Installation Company of the First Building of Shaanxi Construction Engineering Group Co., Ltd., Xi′an 710077, China

Web Publishing Date: 2017-06-01

[1]

焦柯, 杨远丰, 周凯旋, 等.基于BIM的全过程结构设计方法研究[J].土木建筑工程信息技术, 2015, 7(5): 1-7. 

[2]

方速昌, 张世宏, 叶强, 等.基于BIM技术的超大弧度大管径管道制作与安装施工技术[J].施工技术, 2016, 45(S2): 566-570. 

[3]

李云贵, 何关培, 邱奎宁, 等.建筑工程施工BIM应用指南(第二版)[M].中国建筑工业出版社, 2017.3.

[4]

建筑给水排水及采暖工程施工质量验收规范(GB50 242-2002)[M]. 中国建筑工业出版社.

[5]

通风与空调工程施工质量验收规范(GB50243-2016)[M]. 中国建筑工业出版社.

[6]

石韵, 刘军生, 韩大富, 等.BIM技术在某超高层项目施工中的应用研究[J].土木建筑工程信息技术, 2015, 7(3): 67-70. 

[7]

胡振中, 陈祥祥, 王亮, 等.基于BIM的机电设备智能管理系统[J].土木建筑工程信息技术, 2013, 5(1):17-21. 

Metrics
  • PDF Downloads(25)
  • Abstract views(2120)
  • HTML views(731)
Catalog

Figures And Tables

Arc Piping Prefabrication and Assembling with Variable Curvature Base on the BIM Technology

Wang Qixing, Jia Zhangqin

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com