Citation: Huang Yong, Yang Dangfeng, Yang Dongsheng, Liu Lifeng, Li Erkang, Liu Xiaodong, Jia Xinhui. Application of BIM in the Design of Delsi-Tanisagua Hydropower Station. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(4): 12-18. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.03
2017, 9(4): 12-18. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.03
Application of BIM in the Design of Delsi-Tanisagua Hydropower Station
Northwest Engineering Corporation Limited, PowerChina, Xi'an 710065, China |
Delsi-Tanisagua Hydropower Station is a large-scale hydropower project abroad, which is constructed and managed by using the Chinese technology and European codes, respectively.Though the interface of CATIA, Itas CAD, Bochao STD and other professional design software, a collaborative digital design platform is set up to implement the standardized design, collision analysis, calculation analysis, engineering drawings, and etc.All engineering project data sources are integrated and a unified project data center is built, to provide effective support for the high efficiency and fine management for the whole life cycle of the project.
[1] |
张建平.BIM技术的研究与应用[J].施工技术, 2011(2):15-18. |
[2] | |
[3] |
延汝萍, 宋萍萍, 张晓玲, 等.传统施工技术在BIM技术引领下的新发展[J].建筑技术, 2016, 47(8):694-697. |
[4] |
孙永悦.工程设计项目管理的BIM控制思路[J].建筑技术, 2013, 44(10):886-889.doi: 10.3969/j.issn.1000-4726.2013.10.005 |
[5] |
齐成龙.基于达索3D体验平台的BIM技术在斜拉桥锚槽设计中的应用[J].结构工程师, 2017, 33(2):129-134. |
[6] |
张春峰, 周小娟, 贾新会等.水电工程地质信息三维可视化研究及应用[J].资源环境与工程, 2015, 29(5):726-730. |