• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Wu Lufang. Preliminary Study of Integrated Arch Bridge Construction Simulation. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(6): 17-21.

2013, 5(6): 17-21.

Preliminary Study of Integrated Arch Bridge Construction Simulation

SMEDI (Group) Co., Ltd., Shanghai 200092, China

Web Publishing Date: 2013-06-01

[1]

达索系统, 达索PLM解决方案在工程项目中的应用[C]. 第三届工程建设计算机应用创新论坛论文集, 第1-6页, 2011, 上海.

[2]

达索系统, 达索系统集团官方中文网站, http://www.3ds.com/cn/

[3]

黄俊炫等, 基于CATIA的大型桥梁三维建模方法, 第十六届全国工程设计计算机应用学术会议论文集, 2012, 广州.

Metrics
  • PDF Downloads(11)
  • Abstract views(969)
  • HTML views(696)
Catalog

Figures And Tables

Preliminary Study of Integrated Arch Bridge Construction Simulation

Wu Lufang

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com