Citation: Wu Lufang. Preliminary Study of Integrated Arch Bridge Construction Simulation. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(6): 17-21.
2013, 5(6): 17-21.
Preliminary Study of Integrated Arch Bridge Construction Simulation
SMEDI (Group) Co., Ltd., Shanghai 200092, China |
BIM based bridge lifecycle management is information model delivered from planning to design, construction and maintenance. BIM technology will become trend of the future bridge construction and management. However, there is no solution for the whole lifecycle quick and accurate modeling, process management, realtime calculation and simulation, and depend on requirement to dynamic show the construction equipment behavior etc. integrated in one platform. This article is based on a theory of integrated PLM method in one simulation platform, which is an initial approach of bridge PLM, meanwhile compared other possible technical routine for PLM. The platform integrates collaborative design, construction management, construction analysis, construction animation, construction Gantt chart, and maintenance and so on.
[1] |
达索系统, 达索PLM解决方案在工程项目中的应用[C]. 第三届工程建设计算机应用创新论坛论文集, 第1-6页, 2011, 上海. |
[2] |
达索系统, 达索系统集团官方中文网站, http://www.3ds.com/cn/ |
[3] |
黄俊炫等, 基于CATIA的大型桥梁三维建模方法, 第十六届全国工程设计计算机应用学术会议论文集, 2012, 广州. |
Metrics
- PDF Downloads(14)
- Abstract views(1279)
- HTML views(839)