Citation: Ye Wanmin, Lu Xiong, Zhang Shaohui, Liu Baolin. Risk Control of Ultra-deep Metro Station Pit Excavationin Wuhan Soft Soil Area. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(3): 97-103.
2015, 7(3): 97-103.
Risk Control of Ultra-deep Metro Station Pit Excavationin Wuhan Soft Soil Area
1. | Wuhan Metro Group Co., Ltd., Wuhan 430000, China |
2. | Project Management Institute, Huazhong University of Science and Technology, Wuhan 430074, China |
Taking Changfeng station of Wuhan Metro Line Ⅶ as an example, this article shows that the process of ultra-deep excavation have many risks by theoretical analysis of Fault Tree, such as leaking joints, longitudinal instability, pit deformation, gushing water and sand, surface subsidence around the base hang basement uplift and so on. The article analyses the monitoring data during the excavation of Changfeng station in May including the inclinometer of underground continuous wall, soil subsidence, post settlement and so on. The analysis results show that large underground continuous wall inclinometer, upright settlement, underground continuous wall seepage etc. are the signs of large pit deformation, as well as common risks of ultra-deep excavation process. So we should erect steel braces timely, grading excavation, strengthen monitoring and provide rainfall timely to control them. By timely warning and taking appropriate security measures, the excavation pit risk of Changfeng station was controlled effectively, and the main structure of Changfeng station was completed successful. The success of early warning and control of Changfeng station excavation risks can provide recommendations for the Wuhan soft soil excavation.
[1] |
徐杨青, 朱小敏.长江中下游一级阶地地层结构特征及深基坑变形破坏模式分析[J].岩土工程学报, 2006(S1): 1794-1798. |
[2] | |
[3] |
仲景冰, 李惠强, 吴静.工程失败的路径及风险源因素的FTA分析方法[J].华中科技大学学报(城市科学版), 2003(01):14-17.doi: 10.3969/j.issn.2095-0985.2003.01.004 |
[4] |
R. Sturk, L. Olsson and J. Johansson. Risk and Decision Analysis for Large Underground Projects, as Applied to the Stockholm Ring Road Tunnels[J]. Tunneling and Underground Space technology, 1996, 11(2): 157-164. |
[5] |
J.J.Reilly. The Management Process for Complex Underground and Tunneling Projects[J]. Tunneling and Underground Space Technology, 2000, 31-44. |
[6] |
H. H. Einstein. Risk and Risk Analysis in Rock Engineering[J]. Risk Analysis in Tunnelling, (58I): 239-253. |
[7] |
沈鑫国, 胡俊, 曹东辉.南京地铁过江隧道中间风井施工监测分析[J].施工技术, 2014(07):98-102+121. |
[8] |
钱建仁, 黄捷, 吴盛, 刘壮志.郑州地铁车站超深基坑施工风险管理与控制[J].华北水利水电学院学报, 2011(03):86-89. |
[9] |
马险峰.软土地区超深基坑变形特性离心模型试验研究[J].岩土工程学报, 2009(09):1371-1377.doi: 10.3321/j.issn:1000-4548.2009.09.008 |
[10] |
张若霖. 上海软土超深基坑地表沉降特性的统计分析[J]. 地下工程与隧道, 2013(01): 7-10+15+56. |