Citation: Li Xinyu, He Yuhang, Huo Xuxin. Application of BIM Technology in the Suqian Canal Port Project. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(4): 41-47. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.07
2018, 10(4): 41-47. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.07
Application of BIM Technology in the Suqian Canal Port Project
Power China Construction Group Ltd., Beijing 100120, China |
This paper mainly focus on the Suqian Port and Warehouse Project Phase Ⅰ. Considering the high design requirements, complex scheme, limited construction period and green construction requirement, the BIM technology is applied to solve the problems met in the construction period. Numerous high-tech informatized construction technologies are applied to achieve the visualization and parameterized modeling for the complicated engineering. A virtual 3D model is applied to simulate the construction progress, aiming at discovering potential problems and solving them in advance. Accurate engineering data are obtained to implement the cost management in the whole process. Engineering data are shared and reused throughout the whole process, and efforts are made to meet the requirements of green building evaluation. Further investigation on the BIM application in the Suqian Port Project includes its applications in areas of deepening design, visualization, integration with other high-tech, 5D BIM, and etc.
[1] |
陈丽娟, 骆汉宾, 辛宏妍.基于BIM的大型博览项目全寿命周期管理平台开发与应用[J].土木工程与管理学报, 2015, (03):54-61.doi: 10.3969/j.issn.2095-0985.2015.03.011 |
[2] |
刘占省, 李斌, 王杨, 卫启星.BIM技术在多哈大桥施工管理中的应用[J].施工技术, 2015, (12):76-80.doi: 10.7672/sgjs2015120076 |
[3] |
刘占省, 王泽强, 张桐睿, 徐瑞龙.BIM技术全寿命周期一体化应用研究[J].施工技术, 2013, (18):91-95. |
[4] |
陈佳佳, 朱燕.BIM技术在天津永基花园二期项目中的应用[J].土木建筑工程信息技术, 2015, 7(6):96-100. |
Metrics
- PDF Downloads(29)
- Abstract views(2045)
- HTML views(789)