Citation: Ma Zhiliang, Lou Zhe. Basic Issues on Application of IFC Standard in the Cost Estimation of Construction in China. Journal of Information Technologyin Civil Engineering and Architecture, 2009, 1(2): 7-14.
2009, 1(2): 7-14.
Basic Issues on Application of IFC Standard in the Cost Estimation of Construction in China
Tsinghua University, Beijing 100084, China |
The purpose of this paper is to clarify the possibilities and methods of applying the IFC standard, the mainstream standard of BIM technology, in the cost estimation in China. Though analyzing the existing standards and the IFC standard, the problems for using the IFC standard are identified and the solutions are explored. A cost estimation information requirement model which includes seven aspects of information was established. Each aspect of the information is expressed by using IFC to verify the completeness of the IFC standard. As a conclusion, the IFC standard can be used to express the information for the cost estimation in China as a whole and the established model can be applied in the development of software for cost estimation of construction.
[1] |
IFC2x Edition 3 final, http://www.iai-international.org/. |
[2] |
IFC Technical Guide, International Alliance for Interoperability(IAI), 2000 |
[3] |
I. Faraj, M. Alshawi, G. Aouad, et al. An industry foundation classes Web-based collaborative construction computer environment:WISPER [J].Automation in construction, 2002, 10(1) :79-99 |
[4] |
Charlie Fu, Ghassan Aouad, Amanda Marshall Ponting, Angela Lee, Song Wu. IFC implementation in lifecycle costing[J]. Journal of Harbin Institute of Technology, 2004, 11(4) :437-441 |
[5] |
Sheryl Staub-French, Martin Fischer, John Kunz, et al. A generic feature-driven activity-based cost estimation process [J]. Advanced Engineering Informatics, 2003, 17(1) :23-39doi: 10.1016/S1474-0346(03)00017-X |
[6] |
Staub-French S. Feature-driven activity-based cost estimating. PhD Thesis, Stanford University; 2002 |
[7] |
Sheryl Staub-French, Martin Fischer. Formalisms and Mechanisms Needed to Maintain Cost Estimates based on an IFC Product Model[C]. Stanford, CA, USA: 8 th International conference on computing in civil and building engineering, 2000, 1 ~ 9 |
[8] |
Sheryl Staub-French, Martin Fischer, John Kunz, et al. An ontology for relating features with activities to calculate costs[J]. Journal of Computing in Civil Engineering, 2003, 17(4) :243-254doi: 10.1061/(ASCE)0887-3801(2003)17:4(243) |
[9] |
Ali Murat Tanyer, Ghassan Aouad. Moving beyond the fourth dimension with an IFC-based single project database[J]. Automation in construction, 2004, 15-32 |
[10] |
Nobuyoshi Yabuki, Tomoaki Shitani. A Management System for cut and fill earthworks based on 4D CAD and EVMS[J]. Computing in Civil Engineering, 2005, 1-8 |
[11] |
GB50500-2003建筑工程工程量清单计价规范. 2003. |
[12] |
张剑涛, 刁波, 唐春凤, 张汉义. IFC模型中建筑信息的描述与获取方法[C]. 见: 杨富春, 编. 第九届建筑业企业信息化应用发展研讨会论文集. 中国广西南宁: 中国土木工程学会, 2005. 47-51 |
[13] | |
[14] |
王平, 李嘉璠.一种产品数据的图形表达方法—EXPRESS-G[J].计算机辅助设计与制造, 1999, 9:56-58 |
[15] |
GJD-101-95全国统一建筑工程基础定额, 1995 |
Metrics
- PDF Downloads(17)
- Abstract views(1098)
- HTML views(1095)