Citation: Yang Jun, Zeng Tiemei. Control Method and Effect Analysis of Construction of Overlapping Tunnels with Short-distance. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(3): 50-54.
2014, 6(3): 50-54.
Control Method and Effect Analysis of Construction of Overlapping Tunnels with Short-distance
1. | School of Civil Engineering & Mechanics, Huazhong University of Science & Technology, Wuhan 430074, China |
2. | Wuhan Metro Group Co., Ltd., Wuhan 430030, China |
Based on overlapping tunnel section from Hongshan Square Station to Zhongnan Road Station of Line No.2 and Line No.4 of Wuhan Metro, this paper proposed a principle of "finish the following part first" for subway construction considering the features of overlapping tunnels with short-distance. It mainly elaborated several key measures, such as shield tunneling control, grouting for mezzanine soil, temporary support in tunnels. Then the monitoring results proved the feasibility of the measures, so that this paper can provide reliable experience for the designation of overlapping tunnels and construction management in the following years.
[1] | |
[2] |
扈森等.地铁重叠隧道设计与施工关键技术研究[M].成都:中铁二院工程集团有限公司, 2007. |
[3] | |
[4] | |
[5] | |
[6] |
仇文革. 地下工程近接施工力学原理与对策研究[D]. 成都: 西南交通大学土木工程学院, 2003. |
[7] |
石山.上下重叠盾构隧道管片内力数值计算分析[J].铁道标准设计, 2009(9):19-22. |
[8] |
郭晨. 近距离重叠盾构隧道施工影响的数值模拟[D]. 成都: 西南交通大学土木工程学院, 2009. |
Metrics
- PDF Downloads(10)
- Abstract views(1028)
- HTML views(668)