Citation: Zhou Yali, Hu Min, Yu Gang. Research on Information-delivery of Tunnel Projects based on IFC Standards. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(6): 1-4. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.01
2015, 7(6): 1-4. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.01
Research on Information-delivery of Tunnel Projects based on IFC Standards
1. | Building Industrialization Research Center of Shanghai University and Shanghai Urban Construclion(Group)Co., Ltd., Shanghai 200072, China |
2. | Department of Civil Engineering of Shanghai University, Shanghai 200072, China |
3. | SHU-UTS Business School, Shanghai 200072, China |
In recent years, BIM technology has been widely used in various engineering areas. The bases of BIM technology are the data standards, and the only way to achieve the goal of sharing information is data standards.The mainstream of BIM data standard is the IFC standard, and this paper draws lessons from foreign experiences in IFC standards as well as the research on IFC standard to define the model view of tunnel engineering construction model and investment analysis model, schedule analysis model and the security analysis model. It provides the basis for the final information sharing in BIM-5D management platform.
[1] |
满庆鹏, 孙成双. 基于IFC标准的建筑施工信息模型[J]. 土木工程学报, 2011, S1期(S1): 239-243. |
[2] |
See R, Karlshoej J, Davis D. An Integrated Process for Delivering IFC Based Data Exchange[J]. 2012-09-16. |
[3] |
明星. 基于MVD的建筑与结构模型转换研究[D]. 上海交通大学, 2014. |
[4] |
周成, 邓雪原. IDM标准的研究现状与方法[C]//计算机技术在工程设计中的应用—第十六届全国工程设计计算机应用学术会议论文集. 2012: 22-27. |
[5] |
刘安申. 基于BIM-5D技术的施工总承包合同管理研究[D]. 哈尔滨工业大学, 2014. |
Metrics
- PDF Downloads(17)
- Abstract views(1987)
- HTML views(1252)