Citation: Zhao Qin, Liu Jue, Liu Yunhe, Hei Xinhong. Layout Planning of Construction Site Based on SLP. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(3): 63-68. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.11
2017, 9(3): 63-68. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.11
Layout Planning of Construction Site Based on SLP
Xi′an University of Technology, Xi′an 710048, China |
Construction site layout is an important part of construction organization and management, which is also the premise and foundation of the project construction.Traditional construction site layout is always based on experience, which causes a lot of unreasonable conditions.This paper applies the systematic layout planning (SLP)method in the layout of the construction site, which based on the research of the correlation of functional zoning in site layout, proposes a feasible plan of site arrangement.Then, various schemes are evaluated through the weighted factor method, and the best one is selected.Result shows that the SLP method is an effective way to solve the optimization problem of the construction site layout, which is able to reduce the cost, as well as lessen the secondary handling of the equipment.The works of this paper can provide reference for the relevant engineering application.
[1] | |
[2] | |
[3] |
张建平, 韩冰, 李久林, 等.建筑施工现场的4D可视化管理[J].施工技术, 2006, (10): 36-38, 62.doi: 10.3969/j.issn.1002-8498.2006.10.014 |
[4] |
汪茂祥.盾构法施工场地布置方法[J].工程机械与维修, 2008, (10): 108-110.doi: 10.3969/j.issn.1006-2114.2008.10.014 |
[5] |
侯春明, 任志平, 杜福祥, 等.可视化技术在建筑施工企业中的应[J].施工技术, 2015, (06): 64-66, 97.doi: 10.3969/j.issn.1672-9323.2015.06.018 |
[6] |
叶慕静, 周根贵.SLP和遗传算法结合在工厂平面布置中的应用[J].华东理工大学学报(自然科学版), 2005, (3): 371-375. |
[7] | |
[8] |
刘旺盛, 兰培真.系统布置设计——SLP法的改进研究[J].物流技术, 2006, (10): 82-85.doi: 10.3969/j.issn.1005-152X.2006.10.027 |
[9] |
范建民. 机车转向架生产线工艺布局评价与优化研究[D]. 大连交通大学, 2013. |
[10] |
李飞, 李伟, 刘昭, 等.基于BIM的施工现场安全管理[J].土木建筑工程信息技术, 2015, (5): 74-77. |
[11] |
郑娇. 建筑施工场地动态布置方案评选研究[D]. 重庆大学, 2014. |
[12] |
郑松涛, 汤文成, 陈昀.SLP法在风电塔筒厂区总平面布置中的应用[J].工业工程与管理, 2010, 15(1): 116-1. |
Metrics
- PDF Downloads(43)
- Abstract views(2418)
- HTML views(1237)