Citation: Lin Jiarui, Zhang Jianping, Zhong Yaofeng. Schedule-resource Trade-off Modeling and Application based on 4D-BIM. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(6): 44-49.
2014, 6(6): 44-49.
Schedule-resource Trade-off Modeling and Application based on 4D-BIM
Tsinghua University, Beijing 100084, China |
According to the key requirements in schedule and resource management during construction, an approach for schedule-resource trade-off problem was established based on 4 Dimensional Building Information Model (4D-BIM) proposed by Tsinghua. With the transforming mechanics between 4D-BIM and Discrete Event Simulation model, schedule-resource trade-off model can be achieved automatically. In addition, the paper explores and analyses the process of SA algorithm in order to tackle the schedule-resource trade-off. The whole solution was applied to a real project and illustrated a good result. The result indicates that the automatic schedule-resource trade-off modelling can free people from intensive work, and reduces repetitive work, which provides managers with a practical tool for schedule arrangement and resource allocation.
[1] |
Liang Y, Chuang C. Variable neighborhood search for multi-objective resource allocation problems[J]. Robotics and Computer-Integrated Manufacturing, 2013, 29(3):73-78.doi: 10.1016/j.rcim.2012.04.015 |
[2] |
Hegazy T, Kassab M. Resource optimization using combined simulation and genetic algorithms[J]. Journal of Construction Engineering and Management, 2003, 129(6):698-705.doi: 10.1061/(ASCE)0733-9364(2003)129:6(698) |
[3] |
王宏, 林丹, 李敏强.一种求解资源受限项目调度问题的自适应遗传算法[J].系统工程, 2005(12): 99-102.doi: 10.3969/j.issn.1001-4098.2005.12.019 |
[4] |
王宏. 求解资源受限项目调度问题算法的研究[D]. 天津大学, 2005. |
[5] |
班克斯.离散事件系统仿真[M].机械工业出版社, 2007. |
[6] |
康立山.非数值并行算法-模拟退火算法[M].科学出版社, 2000. |
[7] |
Metrics
- PDF Downloads(19)
- Abstract views(1559)
- HTML views(759)