• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Lin Jiarui, Zhang Jianping, Zhong Yaofeng. Schedule-resource Trade-off Modeling and Application based on 4D-BIM. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(6): 44-49.

2014, 6(6): 44-49.

Schedule-resource Trade-off Modeling and Application based on 4D-BIM

Tsinghua University, Beijing 100084, China

Web Publishing Date: 2014-12-01

Fund Project: 863项目“基于全生命期绿色住宅产品化数字开发技术研究和应用” 2013AA041307国家自然科学基金“基于云计算的建筑全生命期BIM集成与应用关键技术研究" 51278274863项目“基于全生命期绿色住宅产品化数字开发技术研究和应用”(2013AA041307)、国家自然科学基金“基于云计算的建筑全生命期BIM集成与应用关键技术研究"(51278274)、清华大学-广联达BIM中心课题"基于BIM的绿色建筑全生命期管理技术研究”

[1]

Liang Y, Chuang C. Variable neighborhood search for multi-objective resource allocation problems[J]. Robotics and Computer-Integrated Manufacturing, 2013, 29(3):73-78.doi: 10.1016/j.rcim.2012.04.015

[2]

Hegazy T, Kassab M. Resource optimization using combined simulation and genetic algorithms[J]. Journal of Construction Engineering and Management, 2003, 129(6):698-705.doi: 10.1061/(ASCE)0733-9364(2003)129:6(698)

[3]

王宏, 林丹, 李敏强.一种求解资源受限项目调度问题的自适应遗传算法[J].系统工程, 2005(12): 99-102.doi: 10.3969/j.issn.1001-4098.2005.12.019

[4]

王宏. 求解资源受限项目调度问题算法的研究[D]. 天津大学, 2005.

[5]

班克斯.离散事件系统仿真[M].机械工业出版社, 2007.

[6]

康立山.非数值并行算法-模拟退火算法[M].科学出版社, 2000.

[7]

张建平, 李丁, 林佳瑞, 等. BIM在工程施工中的应用[J].施工技术, 2012(16): 10-17. 

Metrics
  • PDF Downloads(19)
  • Abstract views(1559)
  • HTML views(760)
Catalog

Figures And Tables

Schedule-resource Trade-off Modeling and Application based on 4D-BIM

Lin Jiarui, Zhang Jianping, Zhong Yaofeng

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn