Citation: Cao Le, Xiao Jing, Yao Jinjie, Liu Cunrong, Zhou Yongqiang. BIM Technology Appliation in the Changjiang River Media Building Project Phases(1st). Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(2): 80-83.
2014, 6(2): 80-83.
BIM Technology Appliation in the Changjiang River Media Building Project Phases(1st)
1. | CABR Technology CO.LTD. Beijing 100013, China |
2. | Wuhan Construction CO.LTD. Wuhan 430023, China |
BIM technology were introduced in this paper in the present stage of building project in Wuhan Changjiang river media building application.As a super-tall large public projects, the internal pipeline intensive and high headroom requirement for space. Many problems showed in large span steel structure assembled lifting construction technology and process scheme. By BIM technology, we used information model for collision check and export pipeline project integrated configuration optimization drawings, safety of construction site project plan presentation, as well as to the large span steel girder hoisting schemes such as visual simulation demonstration, further strengthen the guidance of BIM technology for site construction, ensure the management of the construction safety and quality control.
Metrics
- PDF Downloads(14)
- Abstract views(1344)
- HTML views(905)