Citation: Baohua Meng, Yong Zhou. Practice and Reflection on Operation Management of Hospital Construction Projects under the EPC Contract Mode. Journal of Information Technologyin Civil Engineering and Architecture, 2024, 16(4): 113-116. doi: 10.16670/j.cnki.cn11-5823/tu.2024.04.21
2024, 16(4): 113-116. doi: 10.16670/j.cnki.cn11-5823/tu.2024.04.21
Practice and Reflection on Operation Management of Hospital Construction Projects under the EPC Contract Mode
The Third Hospital of Mianyang, Sichuan Mental Health Center, Mianyang 621000, China |
The EPC contract mode in hospital construction often leads to challenges such as overestimation and disjointed transitions between construction and operational maintenance phases. This study investigates the integration of operation management capabilities, focusing on improving connections between the general contractor's construction phase and the pre-operation phase of the hospital. Through quota design, continuous operational demands, and detailed management strategies, the study enhances management efficiency under the EPC contract mode. Emphasis is placed on the application of BIM technology in optimizing hospital building pipe networks and analyzing the net heights of public areas. The research proposes a refined management approach to connect various hospital departments effectively, providing valuable insights for managing medical buildings under the general contract mode.
[1] |
侯玉杰, 邓伟华. 现代医疗建筑综合施工技术与总承包管理[M]. 北京: 中国建筑工业出版社, 2019: 254-289. |
[2] |
EPC工程总承包全过程管理[M]. 北京: 中国电力出版社, 2019: 89-124. |
[3] |
孟宪海, 次仁顿珠, 赵启. EPC总承包模式与传统模式之比较[J]. 国际经济合作, 2004(11): 49-50. |
[4] |
孟宪海, 赵启. EPC模式下业主和承包商的风险分担与对策[J]. 国际经济合作, 2004(12): 45-46. |
[5] |
何让珍, 张增国, 瞿龙, 等. 医院EPC模式项目的设计优化[J]. 中国医院建筑与设备, 2018, 19(1): 37-39. |
[6] |
吴红. EPC模式下项目业主对工程管控的探讨[J]. 四川水力发电, 2020, 39(2): 83-85. |
[7] |
黄凡, 李晓阳. EPC总承包合同计价模式与风险管理研究[J]. 工程管理, 2021, 18: 185-186. |
[8] |
唐福珍, 曹巍, 常晨曦, 等. EPC模式下医院项目设计优化研究与应用[J]. 施工技术, 2020, 49(6): 29-31. |
[9] |
曹巍, 张伟, 唐福珍, 等. 中山大学附属第一(南沙)医院人性化设计与实践[J]. 施工技术, 2020, 49(6): 26-28. |
[10] |
石家鑫, 黄平干. 医院建筑EPC总承包工程的设计与施工交叉技术节点剖析及创新[J]. 施工技, 2017, 46(增): 683-690. |
[11] |
Zheng Yu and Tang Llewellyn C. M. and Chau K. W. . Analysis of Improvement of BIM-Based Digitalization in Engineering, Procurement, and Construction (EPC) Projects in China[J]. Applied Sciences, 2021, 11(24) : 11895-11895. |
[12] |
王勇军. 限额设计在EPC项目中的应用研究[J]. 建筑经济, 2022, 43(11): 67-72. |
Metrics
- PDF Downloads(9)
- Abstract views(353)
- HTML views(206)