• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Zhou Ji, Yan Zhaoxiang, Xu Wenlong, Zhao Guolu, Dong Bojun. Research on BIM Implementation Mode Driven by General Contractor. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(1): 69-73. doi: 10.16670/j.cnki.cn11-5823/tu.2018.01.12

2018, 10(1): 69-73. doi: 10.16670/j.cnki.cn11-5823/tu.2018.01.12

Research on BIM Implementation Mode Driven by General Contractor

1. 

School of Civil Engineering and Transportation, Hebei University of Technology, Tianjin 300401, China

2. 

CSCEC City Construction Development Co., Ltd., Beijing100037, China

Web Publishing Date: 2018-02-01

[1]

孙峻, 李明龙, 李小凤.业主驱动的BIM实施模式研究[J].土木工程与管理学报, 2013, 30(3): 80-85. 

[2]

程建华, 王辉.项目管理中BIM技术的应用与推广[J].施工技术, 2012(16): 18-21. 

[3]

马智亮.追根溯源看BIM技术的应用价值和发展趋势[J].施工技术, 2015, 44(6): 1-3. 

[4]

何关培. 何关培谈BIM博客[EB/OL]. http//blog.sina.com.cn/heguanpei, 2009-2017.

[5]

郑云, 苏振民, 金少军.BIM-GIS技术在建筑供应链可视化中的应用研究[J].施工技术, 2015, 44(6): 59-63. 

[6]

李云贵, 何关培, 邱奎宁, 等.建筑工程施工BIM应用指南[M].2014.北京:中国建筑工业出版社.58-98.

[7]

李瑞娟.试论施工单位在项目施工过程中的成本控制[J].中小企业管理与科技, 2012(8): 93-94. 

[8]

寇雪霞, 石振武.BIM技术在施工阶段的成本控制应用[J].经济师, 2016(1): 72-73. 

[9]

许杰峰, 雷星晖.基于BIM的建筑供应链管理研究[J].建筑科学, 2014(5): 85-89. 

[10]

杨震卿, 潘朝晖, 田丰, 等.BIM技术开创混凝土算量工作新模式[J].建筑技术, 2015, 46(2): 129-131. 

Metrics
  • PDF Downloads(36)
  • Abstract views(2189)
  • HTML views(778)
Catalog

Figures And Tables

Research on BIM Implementation Mode Driven by General Contractor

Zhou Ji, Yan Zhaoxiang, Xu Wenlong, Zhao Guolu, Dong Bojun

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com