Citation: Lv Weicai, Lu Shaohu, Qin Kai, Wei Zhipeng, Tian Longlong. Application of P-BIM Theory in No.6 Institute of CASC Project. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(6): 15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.04
2015, 7(6): 15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.04
Application of P-BIM Theory in No.6 Institute of CASC Project
The Second Construction Co., Ltd., of China Construction Third Engineering Bureau, Wuhan 430074, China |
BIM technology and Internetof Things, cloud technology, project integrated management system and other professional technology are integrated applications, which realize the change of BIM application from a single business to multi-business integration applications, single technology application to project management integration applications, stand-alone application to cooperative application based on network, maximizing the comprehensive value of BIM application and improving the general contracting management ability.
[1] | |
[2] |
赵昕等.中国建筑施工行业信息化发展报告(2015):BIM深度应用与发展[M].北京:中国城市出版社. |
[3] |
何关培等.施工企业BIM应用研究(一)[M].北京:中国建筑工业出版社. |
[4] |
何关培.BIM总论[M].中国建筑工业出版社, 2011. |
Metrics
- PDF Downloads(10)
- Abstract views(1997)
- HTML views(1173)