• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Wang Haibin, Wang Yong, Wang Shen, Ma Shengdong. BIM based Integrated Management in Wanda Cultural Tourism Projects. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(5): 15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.03

2016, 8(5): 15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.03

BIM based Integrated Management in Wanda Cultural Tourism Projects

Wanda Cultural Tourism Planning & Research Institute Co., Ltd., Beijing 100022, China

Web Publishing Date: 2016-10-01

[1]

潘佳怡, 赵源煜.中国建筑业BIM发展的阻碍因素分析[J].工程管理学报, 2012, 01: 6-11.doi: 10.3969/j.issn.1674-8859.2012.01.002

[2]

李久林, 魏来, 王勇.智慧建造理论与实践[M].北京:中国建筑工业出版社, 2015.

[3]

何清华, 钱丽丽, 段运峰, 李永奎. BIM在国内外应用的现状及障碍研究[J].工程管理学报, 2012, 01: 12-16.doi: 10.3969/j.issn.1674-8859.2012.01.003

[4]

张鸣. 合肥万达文化旅游城项目签约仪式举行[N]. 安徽日报, 2013-05-29A02.

Metrics
  • PDF Downloads(22)
  • Abstract views(2012)
  • HTML views(911)
Catalog

Figures And Tables

BIM based Integrated Management in Wanda Cultural Tourism Projects

Wang Haibin, Wang Yong, Wang Shen, Ma Shengdong

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com