Citation: Wang Haibin, Wang Yong, Wang Shen, Ma Shengdong. BIM based Integrated Management in Wanda Cultural Tourism Projects. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(5): 15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.03
2016, 8(5): 15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.03
BIM based Integrated Management in Wanda Cultural Tourism Projects
Wanda Cultural Tourism Planning & Research Institute Co., Ltd., Beijing 100022, China |
Large-scale cultural tourism projects usually have a huge amount of investment, complex site and rich in architectural form, diverse recreational facilities and other features. BIM is usually adopted to solve the increasingly complex technical and management issues. Wanda Group began to explore BIM in the design, construction and other fields of application mode in large-scale cultural tourism projects in 2012, and gradually worked out a practical method to enhance the design and construction quality, optimize project cost etc. In this paper, we will introduce the main points of BIM based integrated management, procedures, standards and the platforms in Wanda cultural tourism projects. At last, a BIM based Integrated Management in cultural tourism project is introduced.
[1] |
潘佳怡, 赵源煜.中国建筑业BIM发展的阻碍因素分析[J].工程管理学报, 2012, 01: 6-11.doi: 10.3969/j.issn.1674-8859.2012.01.002 |
[2] |
李久林, 魏来, 王勇.智慧建造理论与实践[M].北京:中国建筑工业出版社, 2015. |
[3] |
何清华, 钱丽丽, 段运峰, 李永奎. BIM在国内外应用的现状及障碍研究[J].工程管理学报, 2012, 01: 12-16.doi: 10.3969/j.issn.1674-8859.2012.01.003 |
[4] |
张鸣. 合肥万达文化旅游城项目签约仪式举行[N]. 安徽日报, 2013-05-29A02. |
Metrics
- PDF Downloads(26)
- Abstract views(2347)
- HTML views(1061)