Citation: Lian Lichuan, Zhang Pengchen, Liu Yanni. Preliminary Procedure Study on BIM-based Steel Bars Picking Optimization. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(4): 69-72. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.12
2016, 8(4): 69-72. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.12
Preliminary Procedure Study on BIM-based Steel Bars Picking Optimization
College of Civil Engineering, Fujian Provincial Key Laboratory of Advanced Technology and Informatization in Civil Engineering, National Civil Engineering Virtual Simulation Experimental Teaching Research Center, Fujian University of Technology, Fuzhou 350118, China |
Reinforced concrete(RC)is a component of a concrete-based frame structure.It accounts for a large proportion of the cost.Traditional steel bars picking has such problems as deviation calculating the amount of material, picking no effective rules and so on, which lead to unnecessary increase of steel bars cost.Building information modeling(BIM)virtual simulation technology can guide the actual engineering.This study focuses on two major aspects: (1)detail construction design and(2)steel bars picking to combine BIM technology and optimization algorithms to establish a preliminary procedure of BIM-based Revit reinforcement and steel bars picking methodology.This study provides ideas for later development of BIM-based steel bars picking plug-in software to achieve steel bars picking optimization and reduce waste of resources.
[1] |
杨党辉, 苏原, 孙明. 基于技术的混凝土结构配筋精益化设计分析[C]. 工程建设中计算机应用与创新实践, 2004: 203-207. |
[2] | |
[3] |
刘燕妮, 连立川, 吴波.以粒子蜂群神经网络建立高性能混凝土强度模型[J].福州大学学报, 2016, 44(2): 253-258.doi: 10.7631/issn.1000-2243.2016.02.0253 |
[4] |
连立川, 刘燕妮, 叶怡成.以粒子蜂群网络建立高性能混凝土坍落度模型[J].福建工程学院学报, 2015, 13 (1): 1-9. |
[5] |
Li-Chuan Lien, min-Yuan Cheng, A hybrid swarm intelligence based particle-bee algorithm for construction Site Layout Optimization, Expert Systems with Applications, 2012(39): 9642-9650.doi: 10.1016/j.eswa.2012.02.134 |
[6] |
Li-Chuan Lien, min-Yuan Cheng, Particle bee algorithm for tower crane layout with material quantity supply and demand optimization, Automation in Construction, 2014 (45): 25-32.doi: 10.1016/j.autcon.2014.05.002 |
Metrics
- PDF Downloads(28)
- Abstract views(2210)
- HTML views(796)