Citation: Chang Liling, Zhang Mingliang, Jiang Bo, Hu Yi, Wu Yangyi, Wei Weihong. Application of BIM Technology in the Construction of Prestressed Anchor Cable for Deep Foundation Pit Support. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(3): 31-37. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.05

2017, 9(3): 31-37. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.05

Application of BIM Technology in the Construction of Prestressed Anchor Cable for Deep Foundation Pit Support

1. 

Hunan No.6 Engineering Co., Ltd., Changsha 410015, China

2. 

Hunan Construction Engineering Group General Co., Ltd., Changsha 410004, China

3. 

Shanghai K & Z Construction Project Management Co., Ltd., Shanghai 200092, China

Web Publishing Date: 2017-06-01

[1]

张明亮, 黄宗贵, 周瑾, 等.BIM技术在隆平水稻博物馆项目施工中的应用[J].建筑技术, 2017, 48(5): 504-507. 

[2]

黄宗贵, 张明亮, 周瑾, 等.BIM技术在双曲薄壳混凝土屋面施工中的应用[J].土木建筑工程信息技术, 2016, 8(1): 15-21. 

[3]

杨骐麟. 基于BIM的可视化协同设计应用研究[D]. 西南交通大学, 2016.

[4]

任远谋. BIM在我国建筑行业应用影响因素研究[D]. 重庆大学, 2016.

[5]

何建军, 王硕, 姚守俨.基坑工程BIM技术应用[J].土木建筑工程信息技术, 2016, 8(6): 55-59. 

[6]

杨国平, 刘志刚.基于BIM的基坑施工任务检测云平台[J].土木建筑工程信息技术, 2016, 8(6): 44-50. 

[7]

凌康棋, 许福, 谢大江, 等.基于BIM技术和有限元分析的抗浮锚杆优化设计[J].土木建筑工程信息术, 2016, 8(6): 1-7. 

[8]

CECS22: 2005岩土锚杆(索)技术规程[S]. 北京: 中国计划出版社, 2013.

Metrics
  • PDF Downloads(28)
  • Abstract views(2994)
  • HTML views(1038)
Catalog

Figures And Tables

Application of BIM Technology in the Construction of Prestressed Anchor Cable for Deep Foundation Pit Support

Chang Liling, Zhang Mingliang, Jiang Bo, Hu Yi, Wu Yangyi, Wei Weihong

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn