Citation: Liu Zhao, Qu Jing, Yang Hua, Shu Zhiqiang. Application of Two-dimensional Code Management Platform in PKPM Construction. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(6): 106-110. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.20
2016, 8(6): 106-110. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.20
Application of Two-dimensional Code Management Platform in PKPM Construction
CABR Technology Co., Ltd., Beijing 100013, China |
:This paper is based on the deep analysis on existing in material management, project management and logistics information management, and the actual two-dimensional code management platform, elaborated the use of two-dimensional code technology aided project business management, summarizes the two-dimensional code technology in the construction of the business management advantages.
[1] |
崔海斌. 关于推进施工企业物资管理现代化的探讨[M]. 现代经济信息, 2011. |
[2] |
张成军, 凌登旺. 施工期间物资的科学管理[M]. 企业科技与发展, 2008. |
[3] | |
[4] |
徐伟, 李建伟.土木工程项目管理[M].上海:同济大学出版社, 2000:447-516. |
[5] |
Charles Handy. The Age of Unreason, London: Century Hutchinson, 1989. |
[6] |
William R. Bigler, Marilyn Norris New Science of Strategy Execution: How Established Firms Become Fast, Sleek Wealth Creators, Praeger Publishers, 2004. |
[7] |
Eastman C, Teicholz P, Sacks R, etc. BIM handbook:aguide to building information modeling for owners, managers, designers, engineers, and contractors[M]. 2nd ed. New Jersey:John Wiley & Sons, 2011:13. |
[8] |
胡素芳.二维条码技术及应用简介[J].福建电脑, 2002(12).doi: 10.3969/j.issn.1673-2782.2002.12.001 |
[9] |
Metrics
- PDF Downloads(21)
- Abstract views(2149)
- HTML views(841)