Citation: Wang Zhongcheng, Wang Lei, Chu Nannan. The Subway Mechanical and Electrical Installation and Decoration Engineering Model Merging Problem Analysis. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(6): 68-72. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.13
2016, 8(6): 68-72. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.13
The Subway Mechanical and Electrical Installation and Decoration Engineering Model Merging Problem Analysis
Guang Dong Zhong Gong Project Management Co., Ltd., Guangzhou 510000, China |
BIM Technology was applied in the construction of Guangzhou metro line 6 second phase of the mechanical and electrical installation and public area decoration project. The different profession construction units completed the construction model according to the design drawings, the site supervision organized the various professional construction units to finish the model merge. There were many problems in model merging process. This article gives a brief analysis and puts forward feasible solutions, and looks forward to the model merge in the late subway line construction.
[1] |
严事鸿, 赵春雷, 郑刚俊.基于BIM的建设工程监理模式的研究[J].建设监理, 2015, 197(11): 13-17.doi: 10.3969/j.issn.1007-4104.2015.11.003 |
[2] | |
[3] | |
[4] |
陈谦. 4D信息模型对施工过程的影响分析[J].山西建筑, 2010, 36(15): 202-204.doi: 10.3969/j.issn.1009-6825.2010.15.125 |
[5] | |
[6] |
Metrics
- PDF Downloads(16)
- Abstract views(1938)
- HTML views(774)