• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Huang Daojun, Yan Bin, Wen Jiangtao, Fan Dongdong, Zhao Qingke, Li Xiaoliang. Integrated BIM Application in Construction of Tencent Beijing Headquarter. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(2): 16-22. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.03

2016, 8(2): 16-22. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.03

Integrated BIM Application in Construction of Tencent Beijing Headquarter

The First Construction Engineering Limited Company of China Construction Third Engineering Bureau, Wuhan 430040, China

Web Publishing Date: 2016-04-01

[1]

马智亮.我国建筑施工行业BIM技术应用的现状、问题及对策[J].中国勘察设计, 2013(11):39-42. 

[2]

张建平, 范酷, 王阳利等.基于4D-BIM的施工资源动态管理与成本实时监控[J].施工技术, 2011(4):37-40. 

[3]

张云翼, 张建平, 刘强等.基于BIM的非结构化信息自动关联机制研究[J].土木建筑工程信息技术, 2015, 7(3):16-21. 

[4]

颜斌, 黄道军, 文江涛等.测绘地理信息仪器装备发展研究(2015)[M].2015年10月第1版.北京:测绘出版社, 2015:115-117.

[5]

Thanh Nguyen Tien, 刘修国, 王红平等. 基于激光扫描技术的三维模型重建[J]. 激光与光电子学进展.

Metrics
  • PDF Downloads(22)
  • Abstract views(2223)
  • HTML views(829)
Catalog

Figures And Tables

Integrated BIM Application in Construction of Tencent Beijing Headquarter

Huang Daojun, Yan Bin, Wen Jiangtao, Fan Dongdong, Zhao Qingke, Li Xiaoliang

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn