• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Liu Zhao, Qu Jing. Application of 4D Virtual Construction based on PKPM Construction Management Platform. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(6): 37-42. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.08

2015, 7(6): 37-42. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.08

Application of 4D Virtual Construction based on PKPM Construction Management Platform

CABR Technology Co., Ltd., Beijing 100013, China

Web Publishing Date: 2015-12-01

Fund Project: 住建部科学技术计划课题 2014-K8-033住建部科学技术计划课题(2014-K8-033)“基于BIM的工程管理协同平台系统的研究与开发”

[1]

徐伟, 李建伟.土木工程项目管理[M].上海:同济大学出版社, 2000:447-516.

[2]

何清华, 韩翔宇.基于BIM的进度管理系统框架构建和流程设计[J].项目管理技术, 2011(9):96-99. 

[3]

ChuckEastman, PaulTeicholz, RafaelSacks(Eds.).BIM Handbook:A Guideto Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors[M], New York: John Wileyand Sons, 2008:233-244.

[4]

王广斌, 张洋, 杨学英等.工程项目建设信息化发展方向—虚拟设计与施工[J].武汉大学学报(工学版), 2008, 41(2):90-93. 

[5]

王青薇, 张建平.基于BIM的工程进度计划编制[J].商场现代化, 2010(35):220-222.doi: 10.3969/j.issn.1006-3102.2010.35.157

[6]

乐云.项目管理概论[M].北京:中国建筑工业出版社, 2008: 204-225.

[7]

Eastman C, Teicholz P, Sacks R, etc. BIM handbook: aguide to building information modeling for owners, managers, designers, engineers, and contractors [M].2nd ed. New Jersey: John Wiley & Sons, 2011:13.

Metrics
  • PDF Downloads(15)
  • Abstract views(2106)
  • HTML views(848)
Catalog

Figures And Tables

Application of 4D Virtual Construction based on PKPM Construction Management Platform

Liu Zhao, Qu Jing

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn