• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Wang Fengguo, Yang Lu, Shen Wei, Yuan Tiequan, Zhang Yutong. Application of BIM Technology in Reconstruction and Extension Project of Taolaizhao Super-Grand Bridge in Beijing-Harbin Expressway. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(6): 98-101. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.16

2018, 10(6): 98-101. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.16

Application of BIM Technology in Reconstruction and Extension Project of Taolaizhao Super-Grand Bridge in Beijing-Harbin Expressway

1. 

Jilin Jianzhu University, Changchun 130118, China

2. 

Jilin Provincial High Class Highway Construction bureau, Changchun 130033, China

Web Publishing Date: 2018-12-01

Fund Project: 吉林省交通运输科技项目“基于BIM的长余高速公路桥梁改扩建工程质量控制研究” 2018ZDGC-4

[1]

秦利, 赵科, 李鹏云.BIM+GIS技术在桥梁工程施工中的应用研究[J].土木建筑工程信息技术, 2017, 9(5):56-61. 

[2]

李俊卫, 黄玮征, 王旭峰.BIM技术在工程勘察设计阶段的应用研究[J].建筑经济, 2015, 36(9):117-120. 

[3]

董耀文, 王显臣, 张胜超.乐清湾大桥基于Revit软件的桥梁BIM模型参数化设计初探[J].公路, 2016, 61(9):161-164. 

[4]

甘露. BIM技术在施工项目进度管理中的应用研究[D].大连理工大学, 2014.

[5]

程建华, 王辉.项目管理中BIM技术的应用与推广[J].施工技术, 2012, 41(16):18-21+60. 

Metrics
  • PDF Downloads(32)
  • Abstract views(2498)
  • HTML views(1015)
Catalog

Figures And Tables

Application of BIM Technology in Reconstruction and Extension Project of Taolaizhao Super-Grand Bridge in Beijing-Harbin Expressway

Wang Fengguo, Yang Lu, Shen Wei, Yuan Tiequan, Zhang Yutong

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn