Citation: Wang Fengguo, Yang Lu, Shen Wei, Yuan Tiequan, Zhang Yutong. Application of BIM Technology in Reconstruction and Extension Project of Taolaizhao Super-Grand Bridge in Beijing-Harbin Expressway. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(6): 98-101. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.16
2018, 10(6): 98-101. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.16
Application of BIM Technology in Reconstruction and Extension Project of Taolaizhao Super-Grand Bridge in Beijing-Harbin Expressway
1. | Jilin Jianzhu University, Changchun 130118, China |
2. | Jilin Provincial High Class Highway Construction bureau, Changchun 130033, China |
The Taolaizhao super-grand bridge is located at the Changchun-Lalin River Section of the Beijing-Harbin Expressway. The reconstruction and extension project of this bridge faces many difficulties including complex surrounding natural conditions, rough fieldwork survey in cross-river environments, difficult presentation on the traffic organization, and many other challenges in construction. To better promote the construction schedule and the construction quality, this paper investigates the development of many phases includingsurvey, planning, design, construction, operation and maintenance by integrating several BIM software, which has established a consolidate foundationfor the future 3D integrated and coordinated application of the BIM technology, as well as the index optimization, in the reconstruction and extension project.
Metrics
- PDF Downloads(32)
- Abstract views(2498)
- HTML views(1015)