Citation: Liu Ming, Wang Xuefu, Chen Xi, Zhang Guowen, Wu Bin. Application of BIM Technology in the New Zhengzhou Museum Project. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(4): 27-31. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.05
2018, 10(4): 27-31. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.05
Application of BIM Technology in the New Zhengzhou Museum Project
1. | China Construction Third Engineering Bureau Co., Ltd., Wuhan430064, China |
2. | Zhengzhou Construction Investment Group Co., Ltd., Zhengzhou 450000, China |
Projects like large-scaled stadiums and gymnasiums always possess characteristics of novel shaped appearance, complex structure and numerous specialties, and for the construction phase, and faces with difficulties in construction organization, scheduling for different specialties and construction skills. The application of BIM technology can effectively solve such problems. This paper mainly introduces the application of BIM technology in the Zhengzhou Museum during the design and construction phases, which solves the above problems and realizes high standard design, high quality construction and high level management. Through this comprehensive application, the project establishes an owner-driven, whole-process-involved and multi-participant-coordinated BIM implementation system, concludes the method of transmitting design BIM to construction BIM, and forms the integrated mode of BIM and construction production business process. New management ideas appear to deal with the problems of space orientation of complex steel structure in design stage, "Deepening+Processing+Construction" of curved curtain wall, and BIM-based "Progress+Resources+Work" schedule management. This project explores the application of BIM technology in large-scaled venues in combination with reality.Through the application of BIM technology in various professions, the inportance of BIM technologyis concluded in promoting the project implementation, which offers references and powerful supports in following BIM application in large-scaled venues.
[1] |
李久林, 王勇.大型施工总承包工程的BIM应用探索[J].土木建筑工程信息技术, 2014, 6(5):61-65.doi: 10.3969/j.issn.1674-7461.2014.05.011 |
[2] |
吴文勇, 焦柯, 童慧波, 陈剑佳, 黄高松.基于Revit的建筑结构BIM正向设计方法及软件实现[J].土木建筑工程信息技术, 2018, 10(3):39-45. |
[3] |
吴文勇, 焦柯, 童慧波, 陈剑佳, 黄高松.基于Revit的建筑结构BIM正向设计方法及软件实现[J].土木建筑工程信息技术, 2018, 10(3):39-45. |
[4] |
吴文勇, 焦柯, 童慧波, 陈剑佳, 黄高松.基于Revit的建筑结构BIM正向设计方法及软件实现[J].土木建筑工程信息技术, 2018, 10(3):39-45. |
[5] |
唐海燕, 刘荣桂等.基于BIM5D的工程施工成本预测系统构建[J].工程管理学报, 2015, 29(4):107-112. |
Metrics
- PDF Downloads(38)
- Abstract views(2271)
- HTML views(1176)