Citation: Wang Fengbei, Huang Peng. BIM Technology Helps to Improve the Quality and Efficiency of Existing Building Renovation Projects. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(4): 37-40. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.07
2017, 9(4): 37-40. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.07
BIM Technology Helps to Improve the Quality and Efficiency of Existing Building Renovation Projects
SIPPR Engineering Group Co., Ltd., Zhengzhou 450007, China |
This paper studies the problems existed in the existing buildings transformation due to the influences of lacking original completion data, and introduces the method of combining reverse engineering technology, point cloud data processing technology and BIM technology together based on 3D laser scanning, to solve the problems mentioned above.The application of the method in project design and construction process has improved the feasibility of the design, as well as provided an effective solution to optimize and control the height of electromechanical installation of existing buildings.
[1] |
住房和城乡建设部. 2011~2015年建筑业信息化发展纲要, 建质[2011]67号. |
[2] |
住房和城乡建设部. 2016~2020年建筑业信息化发展纲要, 建质[2016]183号. |
[3] |
陆道渊, 黄良, 唐波, 等.三维激光扫描技术在世茂深坑酒店基础设计中的应用[J].结构工程师, 2016, 32(2):159-164. |
[4] |
张亮.BIM与机器人全站仪在场地地下管线施工中的综合应用[J].施工技术, 2016, 45(06):27-31.doi: 10.3969/j.issn.1001-2206.2016.06.007 |
[5] |
赵琰, 刘晓君.既有居住建筑节能改造外部性及其量化研究[J].中国工程科学, 2014, 16(10):100-105.doi: 10.3969/j.issn.1009-1742.2014.10.016 |
[6] |
谢婷, 张晓玲, 孙亦军, 等.BIM技术在机电管线综合深化设计中的应用[J].建筑技术, 2016, 47(8):727-729. |
[7] |
Metrics
- PDF Downloads(30)
- Abstract views(2634)
- HTML views(1126)