Citation: Liu Zhanying, Zhang Zhenyi, Wang Hui, Ma Yonghua, Dong Guilin. Study on Life-Cycle BIM Application in Engineering Phase 1 of Rail Transit Line 1 and Line 2 Project in Hohhot. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(3): 120-127. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.18
2020, 12(3): 120-127. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.18
Study on Life-Cycle BIM Application in Engineering Phase 1 of Rail Transit Line 1 and Line 2 Project in Hohhot
1. | Hohhot Urban Rail Transit Construction Management Co., Ltd., Hohhot 010020, China |
2. | Beijing Rail Transit Design & Research Institute Co., Ltd., Beijing 100068, China |
The engineering Phase 1 of the rail transit Line 1 and Line 2 project in Hohhot is the very first rail transit project in China operated under the full-investment PPP mode in China, which considers the BIM technology as one of major means to implement informatized management. From the life-cycle application of BIM, this paper introduces the life-cycle BIM application system in details, including: the BIM application standard, the BIM data integration and management platform, the BIM application in all different stages of the project, and the digital asset delivery. Hence, a full set of life-cycle BIM application method is formed, providing guidance for the digital construction of urban rail transit.
Metrics
- PDF Downloads(40)
- Abstract views(2653)
- HTML views(1297)