2021,13(1):63-69.
doi: 10.16670/j.cnki.cn11-5823/tu.2021.01.10
This article combines the construction of the office refrigeration mechanical room of the Shenzhen Huide Building Project, analyzes the current technical difficulties in the construction of electrical & mechanical equipment pipelines in the large mechanical room, and proposes a new set of DMBP prefabricated mechanical room construction technology from the perspectives of cost saving, efficient construction, environmental protection and energy saving, which will be processed on-site. The operation is transferred the on-site manufacture work to the digital processing base for digital production, and the prefabricated components are transported to the site for assembly. By focusing on the four core of dmbp, the paper realizes a new construction mode of the machine room for off-site prefabrication and on-site assembly in five stages: deepening design, material procurement, prefabrication, loading and transportation, and field assembly, and providing technical support for the construction of mechanical and electrical equipment pipelines of the assembly machine room.
2019,11(2):59-69.
doi: 10.16670/j.cnki.cn11-5823/tu.2019.02.10
For the real estate development projects, this paper develops an enterprise-level integrated management platform based on BIM technology.With this platform, the BIM technology can be applied in the whole process, and collaborative management can be realized in design management, cost management, schedule management, material management, safety management and quality management. Through the works done in the paper, the authors has explored acollaborative management mode of design and construction integration based on BIM technology.