• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Study on Life-Cycle BIM Application in Engineering Phase 1 of Rail Transit Line 1 and Line 2 Project in Hohhot
Liu Zhanying, Zhang Zhenyi, Wang Hui, Ma Yonghua, Dong Guilin
2020,12(3):120-127. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.18
The engineering Phase 1 of the rail transit Line 1 and Line 2 project in Hohhot is the very first rail transit project in China operated under the full-investment PPP mode in China, which considers the BIM technology as one of major means to implement informatized management. From the life-cycle application of BIM, this paper introduces the life-cycle BIM application system in details, including: the BIM application standard, the BIM data integration and management platform, the BIM application in all different stages of the project, and the digital asset delivery. Hence, a full set of life-cycle BIM application method is formed, providing guidance for the digital construction of urban rail transit.
key words: BIM Technology, Urban Rail Transit, Whole Life-Cycle, BIM Data Integration and Management Platform

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn