• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Development and Prospect of Active Technology of Building Energy Saving
Zhou Wubo, He Zhenyu, Wang Peng, Du Rui, Li Mingzhu
2016,8(6):116-117. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.22
This paper summarizes the development and research situation of active energy-saving technologies in green building, analyzes the existing problems in the development of active energy-saving technologies in China, and puts forward the scientific selection methods and development direction of active energy-saving technologies. provides a basis to the research of activing energy-saving building technology.
key words: Active Energy Saving Technology, Green Building, Energy Efficiency, Building Environment, Reactive Energy Saving Technology
Application Analysis of Green Building Energy Saving Technology——Taking Suzhou Mingxin Environmental Science and Technology Building as A Case
Zhou Wubo, He Zhenyu, Wang Peng, Du Rui, Liu Xinyu, Li Mingzhu
2016,8(5):90-94. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.17
Energy saving technology is playing an increasingly important role in green building. This paper summarizes the development of green building energy-saving technology at home and abroad. Based on the case of Suzhou Mingxin Environmental Science and Technology Building, uses digital simulation software for light insulation, insulation performance of exterior, annual load situation. The paper analyzes the application effect of energy saving technology in this case, combines the theory with case, compares the influencing factors, and puts forward suggestions to improve the indoor health environment, which is the reference for the further development of green building in China.
key words: Green Building, Energy-saving, Case Analysis, Building Physical Simulation
New Thoughts on Intelligent Car Parking Based on BIM Technology
Du Rui, Li Mingzhu, Geng Wei, Qi Ji, Wang Wei, Hu Zhiduo
2019,11(1):48-52. doi: 10.16670/j.cnki.cn11-5823/tu.2019.01.07
The general contracting project of 3D parking lot puts forward high requirement for deepening design, collaborative construction and operation management. The project mainly focuses on the combination of the key content of each node with BIM technology organically to fully play its value. During the planning stage, the quantitative simulation analysis is carried out to ensure the rationality of site selection. During the design stage, multi-professional collaborative design is carried out to ensure the depth of design. Also, full pipeline optimization is carried out to ensure the net height of parking lots, and comprehensive structural stress analysis is carried out to ensure safety performance requirements. During the virtual construction progress, construction simulation, cost control and quality control cover all aspects of design and construction management, which ensures the successful implementation of the project. Based on the BIM model, secondary development is conducted to achieve the data transmission and information inter-connection between the hardware and software. The BIM-based intelligence parking management system improves the operation and comprehensive management level of the parking lot, and optimizes the technical and economic indicators of the whole life cycle of the project.
key words: BIM, Performance Analysis and Simulation, Collaborative Design, Secondary Development

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn