2016,8(6):100-105.
doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.19
In order to adapt to the market economy and the development trend of social production, China and abroad are doing the deep researches on prefabricated construction technology. This paper is based on the existing technical forms of prefabricated components of the logistics management and maintenance of maintenance methods, using actual project application achievements as feedback, in order to accomplishthe whole process visualizationonthe prefabricatedcomponents from production and processing to the transportation and storage, finally from debugging and installationto maintenance and overhaul. Itis easy for managers to adjust the way according to the actual situations of the project, toensure a maximum limit of quality for the prefabricated components sevice through making use of the limited maintenance resources, also improve the accuracy and overall scheduling effectiveness of resource allocation in logistics and maintenance of the prefabricated components.
2020,12(6):40-43.
doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.07
The rise and application of Building Information Modeling (BIM) has effectively solved the problem of collaborative communication of professional information between architecture and structure disciplines. This paper has presented the general process and method of developing the structure model by using the forward design software based on IFC standard, then it has been applied to a high-rise shear wall project. The results show that the construction method of structural information model based on IFC standard can be applied to BIM forward design, which has provided a reliable method to promote the application of BIM forward design in engineering practice in China.