• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Exploration on BIM Application in Project Management of Wuhan Changjiang Media Building
Liu Zhiyuan, Xu Jinsheng, Wang Jiequn, Liu Cunrong, Li Zhengyu
2017,9(2):41-46. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.07
Recently, the building information model (BIM) is gaining stronger importance than ever before in the design, construction, materials procurement, operation fields, etc., and is generally involved in the full life-cycle project management with new attitude. Based on the application practice of Wuhan Changjiang media building project, this paper explores the application process of BIM, a new technology, under the general contracting mode, with the prospect of using BIM technology to assist project management; also, this paper analyzes the various environmental conditions should be satisfied for the BIM technology in project management, as well as the key issues of the BIM technology in project management.
key words: BIM, Project Management, BIM Integrated Information Platform, BIM App
BIM Technology Appliation in the Changjiang River Media Building Project Phases(1st)
Cao Le, Xiao Jing, Yao Jinjie, Liu Cunrong, Zhou Yongqiang
2014,6(2):80-83.
BIM technology were introduced in this paper in the present stage of building project in Wuhan Changjiang river media building application.As a super-tall large public projects, the internal pipeline intensive and high headroom requirement for space. Many problems showed in large span steel structure assembled lifting construction technology and process scheme. By BIM technology, we used information model for collision check and export pipeline project integrated configuration optimization drawings, safety of construction site project plan presentation, as well as to the large span steel girder hoisting schemes such as visual simulation demonstration, further strengthen the guidance of BIM technology for site construction, ensure the management of the construction safety and quality control.
key words: Pipeline Comprehensive Configuration Diagram, Construction Safety Plan Presentation, Large Span Steel Girder Hoisting

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn