2017,9(2):41-46.
doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.07
Recently, the building information model (BIM) is gaining stronger importance than ever before in the design, construction, materials procurement, operation fields, etc., and is generally involved in the full life-cycle project management with new attitude. Based on the application practice of Wuhan Changjiang media building project, this paper explores the application process of BIM, a new technology, under the general contracting mode, with the prospect of using BIM technology to assist project management; also, this paper analyzes the various environmental conditions should be satisfied for the BIM technology in project management, as well as the key issues of the BIM technology in project management.
2014,6(2):80-83.
BIM technology were introduced in this paper in the present stage of building project in Wuhan Changjiang river media building application.As a super-tall large public projects, the internal pipeline intensive and high headroom requirement for space. Many problems showed in large span steel structure assembled lifting construction technology and process scheme. By BIM technology, we used information model for collision check and export pipeline project integrated configuration optimization drawings, safety of construction site project plan presentation, as well as to the large span steel girder hoisting schemes such as visual simulation demonstration, further strengthen the guidance of BIM technology for site construction, ensure the management of the construction safety and quality control.