Study on BIM-based Project Controlling Platform of Wuhan Yangsigang Yangtze River Bridge
Lu Youyue, He Zhiming, Qin Wenbo, Qin Yawei
2017,9(6):16-21. doi: 10.16670/j.cnki.cn11-5823/tu.2017.06.03
This paper firstly elaborates the difficulties of super-large bridge project management, as well as the status of the application of project controlling in the field of traffic engineering. Through the analysis of defects of project controlling mode in information collection, processing and analysis, as well as analysis of advantages of BIM technology application in the project controlling, a BIM-based project controlling mode is proposed, and a BIM-based project controlling platform is established. The overall structure of the platform consists of eight major functional modules, to achieve the implementation of BIM-based project controlling mode. At last, applications of the platform in the Wuhan Yangsigang Yangtze River Bridge project have achieved good results, which provides useful references for the BIM technology applications in the project controlling mode.
key words: Project Controlling, BIM, Super-large Bridge, Management Mode, Management Platform
Study on Application of BIM-Based Digital Management System of Pipelines in Yangsigang Yangtze River Bridge Project
Lu Youyue, Gong Cheng, Zhang Ke, Qin Yawei, Bi Zhihe
2018,10(3):33-38. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.07
With the continuous development of urban modernization, problems appear in current underground pipeline information management in the old town area, including complex pipeline ownership and relationship, unclear underground pipeline layout, and etc. In order to solve these problems, a BIM-based digital management system for underground pipelines is proposed, and its role in the whole process of pipeline project is analyzed. Finally, the underground pipeline digital management system is applied to the Yangsigang Yangtze River Bridge project in Wuhan to achieve the functions of information classification, information retrieval, information visualization and collision detection for underground pipelines. The system effectively improves the management efficiency, increases the project revenue, and provides useful references for BIM technology combined with underground pipeline information management.
key words: Digital Management System, Complex Underground Pipeline, BIM, Whole Process

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn