• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Research and Application of Architecture VR Interactive Technology Based on BIM
Shao Zhengda, Song Tianren
2018,10(3):17-21. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.04
This paper studies the BIM digital module separation technology based on VR, the dynamic rendering technology based on physics, the secondary development technology based on Unity, and the development of BIM architecture VR interactive system based on the virtual reality engine. At the same time, the active 3D time-sharing display technology is researched to form a light and multiplayer VR display scheme. The application in the project of Shanghai Rail Transit Operation Command Building shows that, the method provided in this study is able to accelerate the design of the scene decoration deepening plan, to reduce the number of rework of the model room, and to support the application in the project deepening design process. It is of great promotion value in the field of architectural visualization.
key words: Virtual Reality, BIM, PBR Material, Unity, Time-Sharing Display
A Comprehensive BIM Application in Shanghai Oriental Hospital Reconstruction and Expansion Project
Xu Jinglin, Yu Fangqiang, Gao Shang, Song Tianren
2020,12(4):124-128. doi: 10.16670/j.cnki.cn11-5823/tu.2020.04.17
Shanghai Oriental Hospital renovation and expansion project is very complicated due to the demand of ensuring the uninterrupted operation of the old building, the large number of mechanical and electrical systems, the difficulty of construction coordination, and the high requirements of operation and maintenance management. The paper summarizes the process and results of the comprehensive application of BIM technology. This paper focuses on three phases of application, i.e. the critical BIM application in construction period; the BIM model transformation across different stages; and the operation & maintenance phase BIM in-depth application. Through the whole process, it delivered a digital twin of the hospital′s new building, which achieves the visualization of the process of the building′s big data and the flexibilities. Finally, it has concluded the problems during the BIM implementations and has forecasted the future perspectives, which offers method to improve the qualities of model delivery, to improve the quality of information, and to expend the scope of the BIM implementations.
key words: Building Information Modeling, Digital Twin Building, Building Big Data, Hospital Operation & Maintenance

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn