• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

BIM based Integrated Management in Wanda Cultural Tourism Projects
Wang Haibin, Wang Yong, Wang Shen, Ma Shengdong
2016,8(5):15-20. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.03
Large-scale cultural tourism projects usually have a huge amount of investment, complex site and rich in architectural form, diverse recreational facilities and other features. BIM is usually adopted to solve the increasingly complex technical and management issues. Wanda Group began to explore BIM in the design, construction and other fields of application mode in large-scale cultural tourism projects in 2012, and gradually worked out a practical method to enhance the design and construction quality, optimize project cost etc. In this paper, we will introduce the main points of BIM based integrated management, procedures, standards and the platforms in Wanda cultural tourism projects. At last, a BIM based Integrated Management in cultural tourism project is introduced.
key words: Cultural Tourism Projects, BIM, Integrated Management

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn