2013,5(6):73-80.
This paper describes the BIM application in construction in Yunnan Science and Technology Museum project. BIM application reduced rework in construction and improved the efficiency and resource utilization. It also used to verify construction techniques and processes and optimize the construction program. Finally, self-developed 4D, 5D construction management platform was developed for the project schedule and cost control.
2016,8(5):1-9.
doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.01
As the key supporting project of BOAO Forum for Asia 2016, BOAO Airport was built in 10 months. The construction speed was double of the domestic similar projects. Considering the short period and the high orientation, the project used BIM technology to obtain high quality and performance, applied data reference for the airport construction under BIM times.
2014,6(2):80-83.
BIM technology were introduced in this paper in the present stage of building project in Wuhan Changjiang river media building application.As a super-tall large public projects, the internal pipeline intensive and high headroom requirement for space. Many problems showed in large span steel structure assembled lifting construction technology and process scheme. By BIM technology, we used information model for collision check and export pipeline project integrated configuration optimization drawings, safety of construction site project plan presentation, as well as to the large span steel girder hoisting schemes such as visual simulation demonstration, further strengthen the guidance of BIM technology for site construction, ensure the management of the construction safety and quality control.