• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Deepening BIM Application of Shared Coordinates and Pipelines in Large Electromechanical Complex Space Industrial Park Projects
Pengfei Cheng, Kuo Yu, Li Yang, Bohong Yuan, Xiong Zhang, Lei Zhang, Peihao Yang
2023,15(6):95-100. doi: 10.16670/j.cnki.cn11-5823/tu.2023.06.16
With the upgrading of building industry, intelligent construction and intelligent operation and maintenance, it has been a trend to deepen the application of BIM technology in construction projects. Taking the large-scale industrial park project as the research object, this paper gets rid of the difficulty of positioning and integrating the group project model by using the method of shared coordinates in BIM software. In the aspect of deepening mechanical and electrical pipelines, the visual programming software Dynamo plug-in is used to realize the color filling of different beam heights with one-key operation according to the complex characteristics of basement elevation changes. What's more, the clearance under the beam is intelligently analyzed, so as to provide a basis for the comprehensive layout of electromechanical pipelines. The research results can provide reference for similar projects.
key words: BIM Technology, Visual Programming, Dynamo, Shared Coordinates, Pipeline Integration
Application of BIM Technology in Prefabricated Building Projects
Li Yang, Xiong Zhang, Jinshen Yu, Bohong Yuan, Kuo Yu, Liu Yang, Guoquan Ren
2023,15(5):112-117. doi: 10.16670/j.cnki.cn11-5823/tu.2023.05.20
In recent years, with the guidance of national policies and industry trends, there are increasing prefabricated projects. Combining the BIM technology with project management, this paper puts forward the use of BIM technology to solve fabricated generally encountered in the process of project construction tower crane selection, precasting yard, prefabricated management solutions and prefabricated construction quality problems, which expects to provide certain reference for future engineering practice and promote the further development of BIM technology.
key words: BIM Technology, Prefabricated Building, Tower Crane Selection, Component Tracking

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn