• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Research on Demolition Management Information System and it′s Application in Yangsigang Yangtze River Bridge
Qin Yawei, Liu Sheng, Ma Wenjin, Gong Cheng, Zhang Ke
2018,10(2):104-110. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.21
This paper firstly elaborates the features and significance of demolition management in infrastructure construction.By analyzing the main business and functional requirements of the demolition management system, this paper puts forward the demolition management based on BIM.Its goal, content and structure has been analyzed in the paper.Finally, with the demolition management module in Yang Si Gang Bridge Demolition Management Information System.The superiority and advanced nature of the demolition management method based on BIM have been illustrated sufficiently.It provides a useful reference for the demolition management in similar construction projects.
key words: Demolition Management, Management System, Building Information Modeling, Infrastructure
Implementation Management of BIM in National Conventionand Exhibition Centre (Tianjin) Project
Liu Jun, Meng Fangui, Wei Mengfan, Zhang Ke, Dong Jianfeng
2014,6(6):58-63.
Starting from specifying implementation goal, selecting implementation mode and building implementation framework, this paper introduces implementation management of BIM in National Convention and Exhibition Centre (Tianjin) Project, analyzes BIM’s advantages at design stage, and summerizes problems occurred in the procedure.
key words: BIM, Convention and Exhibition, Standard, Implementation Management
Study on Application of BIM-Based Digital Management System of Pipelines in Yangsigang Yangtze River Bridge Project
Lu Youyue, Gong Cheng, Zhang Ke, Qin Yawei, Bi Zhihe
2018,10(3):33-38. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.07
With the continuous development of urban modernization, problems appear in current underground pipeline information management in the old town area, including complex pipeline ownership and relationship, unclear underground pipeline layout, and etc. In order to solve these problems, a BIM-based digital management system for underground pipelines is proposed, and its role in the whole process of pipeline project is analyzed. Finally, the underground pipeline digital management system is applied to the Yangsigang Yangtze River Bridge project in Wuhan to achieve the functions of information classification, information retrieval, information visualization and collision detection for underground pipelines. The system effectively improves the management efficiency, increases the project revenue, and provides useful references for BIM technology combined with underground pipeline information management.
key words: Digital Management System, Complex Underground Pipeline, BIM, Whole Process

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn