• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research

column
Design Control of High-level Accomplished Projects :BIM-based Design Practice of Sanya Forum Permanent Site
Li Dan
2016, 8(2): 1-5. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.01
Abstract PDF
Risks and Coping Strategies of BIM Application in Construction Stage
Li Zhi, Wang Jing
2016, 8(2): 6-15. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.02
Abstract PDF
Integrated BIM Application in Construction of Tencent Beijing Headquarter
Huang Daojun, Yan Bin, Wen Jiangtao, Fan Dongdong, Zhao Qingke, Li Xiaoliang
2016, 8(2): 16-22. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.03
Abstract PDF
Application of BIM Technology in Guangzhou Pazhou Eye Project
Zhou Yongming, Kou Guanghui, Su Hao
2016, 8(2): 23-31. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.04
Abstract PDF
Rail Transit Information Model Management System used in Hedong Station and Shixi Station of Guangzhou-Foshan Line
Xue Zhigang, Huang Weixiong, Chen Guanghao, Zhang Xiong, Hong Yisheng
2016, 8(2): 32-37. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.05
Abstract PDF
Application of BIM Technology in the Management of Beijing Tian Tan Hospital Project
Gao Mingjie, He Qing
2016, 8(2): 38-43. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.06
Abstract PDF
BIM Design of Painting Workshop for SGMW (ChongQing)
Gong Weiwei, Shen Yu
2016, 8(2): 44-47. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.07
Abstract PDF
Discussion on Government Supervision Mode of Construction based on the Concept of Smart City and BIM
Yuan Xiao, Zhou Tingting
2016, 8(2): 48-53. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.08
Abstract PDF
Integration Application of BIM Technology in Shenzhenwan International Commercial Center of China Resources
Ding Huaying, Liang Qingmiao, Wu Yanhong, Bai Baojun
2016, 8(2): 54-59. DOI: 10.16670/j.cnki.cn11-5823/tu.2016.02.09
Abstract PDF
A Study on the Evaluation of BIM Application in Decoration Engineering Projects
Luo Lan
2016, 8(2): 60-65. DOI: 10.16670/j.cnki.cnll—5823/tu.2016.02.10
Abstract PDF
Analysis on Influences of Different Connection Forms of Corridor Bridge on the Mechanical Performance of Shanghai International Financial Center
Yang Qin
2016, 8(2): 66-76. DOI: 10.16670/j.cnki.cnll-5823/tu.2016.02.11
Abstract PDF
The Research and Engineering Practice of Automatic Generating from Flat Overall Representation to Reinforced Three-Dimensional Model
Xu Minyang
2016, 8(2): 77-83. DOI: 10.16670/j.cnki.cnll-5823/tu.2016.02.012
Abstract PDF
Influence Factors of Ground Surface Subsidence Induced by Shield Tunneling in Subway Construction
Liao Lizhao, Guo Pu, Yang Jun
2016, 8(2): 84-89. DOI: 10.16670/j.cnki.cnll-5823/tu.2016.02.13
Abstract PDF
Development of CAD Software for Pipe Workshop Technology Design
Wang Zhen, Ding Weijie, Zheng Pengfei, Huang Hong, Hu Shinan
2016, 8(2): 90-93. DOI: 10.16670/j.cnki.cnll-5823/tu.2016.02.14
Abstract PDF
Bidding Evaluation of Construction Engineering based on the Balance of Subjective and Objective Weights Aspects
Fang Yanyan, Xu Fuyuan
2016, 8(2): 94-99. DOI: 10.16670/cnki.cnll-5823/tu.2016.02.15
Abstract PDF
Ontology-based Analysis on the Early Warning of the Surface Subsidence in the Process of Tunnel Shield Project
Du Juan, He Renzhil, Dai Lingjunl
2016, 8(2): 100-108. DOI: 10.16670/j.cnki.cnll-5823/tu.2016.02.16
Abstract PDF
Research on Emergency Management of Metro Construction based on Case-based Reasoning
Zhu Hongxia
2016, 8(2): 109-114. DOI: 10.16670/j.cnki.cnll-5823/tu.2016.02.17
Abstract PDF