Citation: Dong Litao, Xu Hantao, Cao Le, Fang Ligang, Tang Xinyuan. BIM Application in the Construction of Stiff Columns ofWuhan Greenland Center. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(4): 41-43. doi: 10.16670/j.cnki.cn11-5823/tu.2015.04.06
2015, 7(4): 41-43. doi: 10.16670/j.cnki.cn11-5823/tu.2015.04.06
BIM Application in the Construction of Stiff Columns ofWuhan Greenland Center
1. | CABR Technology Co., Ltd., Beijing 100013, China |
2. | Chinese Construction Third Engineering Bureau Co., Ltd., Wuhan 430023, China |
Wuhan Greenland Center is the highest building under construction in China. Its stiff column steel framework and rebar overlaps each other in a very complicated way, the operation space for binding the rebar is small and the construction faces many challenges, and therefore, the two dimensional drawings can hardly show the structures of the rebar and the steel framework. By applying BIM, the project simulates the construction process of distributing and binding the rebar, solve the problems beforehand, and uses the optimized binding plan of BIM.
[1] |
江宇冠, 吴平春, 王耀, 等. BIM技术在某工程复杂节点钢筋设计中的应用[J].施工技术, 2013 (24): 93-96.doi: 10.7672/sgjs2013240093 |
[2] | |
[3] |
何关培. BIM在建筑业的位置, 评价体系及可能应用[J].土木建筑工程信息技术, 2010 (1): 109-116. |
[4] | |
[5] | |
[6] |
Metrics
- PDF Downloads(18)
- Abstract views(1685)
- HTML views(689)