• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Xing Min, Wang Shuhong, Hou Wenshuai, Al Surmi. Establishment and Application of Metro Station Model based on BIM Technology and Optimization of Construction Scheme of Open Cut Method. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(3): 39-43. doi: 10.16670/j.cnki.cn11-5823/tu.2016.03.07

2016, 8(3): 39-43. doi: 10.16670/j.cnki.cn11-5823/tu.2016.03.07

Establishment and Application of Metro Station Model based on BIM Technology and Optimization of Construction Scheme of Open Cut Method

College of Resource and Civil Engineering, Northeastern University, Shenyang 110819, China

Web Publishing Date: 2016-06-01

Fund Project: 国家自然科学基金“节理岩体岩桥贯通准则研究及块体稳定性分析” 51474050国家自然科学基金“节理岩体岩桥贯通准则研究及块体稳定性分析” (编号:51474050);地质灾害防治与地质环境保护国家重点实验室“节理岩体宏细观数值表征及其力学特性尺寸效应研究”(编号:SKLGP2014K011)地质灾害防治与地质环境保护国家重点实验室“节理岩体宏细观数值表征及其力学特性尺寸效应研究” SKLGP2014K011

[1]

LAISERINJ. Comparing pommes and naranjas [EB/OL]. (2002)http://www.Laiserin.com/.

[2]

GUO H L., LI H., SKITMORE M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, 2010, 26(1):41-47.doi: 10.1061/(ASCE)0742-597X(2010)26:1(41)

[3]

美国国家BIM标准第一版第一部分:

National Institute of Buiding Sciences, United States National Building Information Modeling Standard, Version1 -Part 1[S].

[4]

刘晓东, 李春红.开发建筑多专业三维协同设计系统的研究[J].科技情报开发与经济, 2006, 16(19):159-161.doi: 10.3969/j.issn.1005-6033.2006.19.095

LIUXiaodong, Li Chuanhong. Study on Developing the 3D Cooperative Design System for Various Architectural Specialties [J]. Sci-Tech Information Development & Economy, 2006, 16(19):159-161.doi: 10.3969/j.issn.1005-6033.2006.19.095

[5]

杜欣. BIM在地铁车站中的应用[J].四川建筑, 2015, 35 (1):241-242. 

DUXin. Application of BIM in metrostation[J]. Sichuan architecture, 2015, 35(1):241-242. 

[6]

梁学燕. BIM技术在沈阳地铁车站设计中的应用研究[J].北方交通, 2015 (7): 107-110. 

LIANGXueyan. Study on Application of BIM Technology in Shenyang Metro Station Design [J]. Communi cations Northern, 2015 (7):107-110. 

[7]

丁烈云, 龚剑, 陈建国. BIM应用·施工[M].上海:同济大学, 2015. 1-5.

[8]

魏亮华. 基于BIM技术的全寿命周期风险管理实践研究[D]. 南昌大学硕士学位论文. 2013.

[9]

李祥伟, 孙剑.建筑信息模型在中国建筑业的发展思考[J].建筑经济, 2011 (4):25-28. 

LIXiangwei, SUN Jian. Thoughts on the development of building information model in China′s construction industry[J]. Construction economy, 2011(4):25-28. 

[10]

DariusMigilinskas, Vladimir Popov, Leonas Ustinovichius. The benefits, obstacles and problems of practical BIM implementation [J]. Procedia Engineering, 2013 (57): 767-774. 

[11]

柴家远.大型复杂地下空间总体设计研究[J].铁道工程学报, 2012(7):77-81. 

CHAIJiayuan. Research on Overall Design of Large-scale Complex Underground Space [J]. Journal of Railway Engineering Society, 2012 (7): 77-81. 

[12]

李坤. BIM技术在地铁车站结构设计中的应用研究[J].铁道工程学报, 2015(2):103-108. 

LI Kun. The Application Study of BIM Technology in the Structure Design of Subway Station[J].. Journal ofRailway Engineering Society, 2015(2):103-108. 

[13]

任刚, 邢民, 荆艳会等.受控于结构面的岩质高边坡失稳预测技术研究[J].水利与建筑工程学报, 2015, 13(6):48-53. 

REN Gang, XING Min, JING Yanhui. A research on instability prediction technology of rock slope controlled by the structural plane [J]. Journal of Water Resources and Architectural Engineering, 2015, 13 (6): 48-53. 

[14]

邢民, 王述红, 许春兴.直立高边坡逆作法装配式锚索挡土墙施工技术[J].土木建筑与环境工程, 2015, 37: 164-167.doi: 10.11835/j.issn.1005-2909.2015.05.041

XINGMin, WANG Shuhong, XU Chunxing. Construction technique of vertical high slope top-down method assembly type anchor retaining wall[J]. journai of civil architectural&environmental engineering, 2015, 37: 164-167.doi: 10.11835/j.issn.1005-2909.2015.05.041

Metrics
  • PDF Downloads(19)
  • Abstract views(1947)
  • HTML views(744)
Catalog

Figures And Tables

Establishment and Application of Metro Station Model based on BIM Technology and Optimization of Construction Scheme of Open Cut Method

Xing Min, Wang Shuhong, Hou Wenshuai, Al Surmi

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com