Citation: Liao Ling, Mo Zhuanheng, Yang Lei, Zhang Jie, Su Youzhi, Deng Yuchen, Huang Kaize. Application of BIM Technology in Electromechanical Engineering Construction of Chuangye Road Station of Nanning Rail Transit Line 3. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(5): 7-18. doi: 10.16670/j.cnki.cn11-5823/tu.2019.05.02
2019, 11(5): 7-18. doi: 10.16670/j.cnki.cn11-5823/tu.2019.05.02
Application of BIM Technology in Electromechanical Engineering Construction of Chuangye Road Station of Nanning Rail Transit Line 3
1. | School of Civil Engineering and Architecture, Guangxi University of Science and Technology, Liuzhou 545006, China |
2. | Building Information Modeling Research Center, Guangxi University of Science and Technology, Liuzhou 545006, China |
3. | Electrical Engineering Co., Ltd. of China Railway 12th Breau Group, Tianjin 300308, China |
The Chuangye Road Station of Nanning Rail Transit Line 3 is located at the intersection of Chuangye Road and Zhenxing Road, Xixiangtang District, Nanning City, Guangxi Province, with the length direction along the east-west direction of Zhenxing Road. The station is a typical station in the form of a two-story single-column island platform. The total length of the outsourcing is 210m, the standard section width is 19.7m, and there are 4 entrances or exits. The B1 floor is the subway hall, and the B2 floor is the subway platform, with 2, 805 m2 public area in total. There are many difficulties faced by the Chuangye Road Station project, including poor natural lighting conditions on the working surface of the subway station, deviations in the size of the main structure and installation drawings, densely layered pipelines in various systems, multiple layers and processes in the cross-operation, large number of professional cooperation interfaces, narrow transport corridor for large equipment, high quality requirements, and etc. Through the establishment of university-company joint research team on BIM technology, over ten applications of BIM technology on electromechanical engineering during construction stages have been studied and realized, including BIM-based 3D laser scanning and lofting technology, integrated deepening design of electromechanical pipelines, deepening and application of fine decoration, visual construction and construction, safety fire evacuation simulation, AR application, scale 3D printing technology. More than ten construction stages of mechanical and electrical engineering BIM technology application research, and etc. The studies provide practical examples for the typical station of the subway to improve quality and efficiency through BIM application research.
[1] |
李小飞, 李赟, 张林.基于三维激光扫描的BIM技术在上海世茂深坑酒店方案优化中的应用[J].施工技术, 2015(19): 35-38. |
[2] |
Mao-hua LIU, Ying-chun YOU, Man-wen LI, Zi-wei HAN.Research on the Construction of BIM Visualization Model Based on 3D Laser Point Cloud Data[P].DEStech Transactions on Computer Science and Engineering, 2018. |
[3] |
贾雪, 刘超, 徐炜, 等.海量点云数据的建筑物三维模型重建[J].测绘科学, 2019, 44(04): 124-129, 181. |
[4] | |
[5] |
何建军, 危鼎, 姚守俨, 等.三维扫描技术结合BIM在佘山深坑酒店项目的应用[J].土木建筑工程信息技术, 2015, 7(04): 31-38. |
[6] | |
[7] |
邢振华, 胡明媚, 周斌科, 等.BIM技术在大型商业综合体中机电深化设计的应用研究[J].施工技术, 2017, 46(S2): 1225-1229. |
[8] |
苏明, 曹立纲, 谭武.BIM机电专业应用, 我们是领先了还是落后了?[J].土木建筑工程信息技术, 2013, 5(2): 96-100.doi: 10.3969/j.issn.1674-7461.2013.02.017 |
[9] |
郭伟.放样机器人在异形建筑内装修中的应用[J].建筑技术开发, 2018, 45(02): 69-70.doi: 10.3969/j.issn.1001-523X.2018.02.034 |
[10] |
刘骏, 罗兰, 聂鹏飞.BIM放样机器人在装饰施工天花吊杆定位中的应用[J].施工技术, 2017, 46(09): 86-88. |
[11] |
Reza Zaker, Eloi Coloma.Virtual reality-integrated workflow in BIM-enabled projects collaboration and design review:a case study[J].Visualization in Engineering, 2018, 6(1): 4.doi: 10.1186/s40327-018-0065-6 |
[12] |
侯春明, 任志平, 杜福祥, 等.浅谈施工方案三维可视化技术交底[J].施工技术, 2015, 44(S1): 522-525. |
[13] |
杨文博, 高峰, 朱洁, 等.BIM+VR技术在打造精品住宅工程中的应用[J].土木建筑工程信息技术, 2017, 9(4): 26-30. |
[14] |
郜建忠, 吕燕军.BIM技术在客运专线48m简支梁节段拼装施工中的应用[J].铁道建筑, 2016(06): 40-43. |
[15] |
李坤.BIM技术在地铁车站结构设计中的应用研究[J].铁道工程学报, 2015(2): 103-108.doi: 10.3969/j.issn.1006-2106.2015.02.020 |
[16] |
王婷, 杜慕皓, 唐永福, 等.基于BIM的火灾模拟与安全疏散分析[J].土木建筑工程信息技术, 2014, 6(06): 102-108.doi: 10.3969/j.issn.1674-7461.2014.06.018 |
[17] |
邓朗妮, 刘晓凤, 陆云鹏.基于BIM的火灾模拟与安全疏散研究[J].施工技术, 2017, 46(24): 79-82. |
[18] | |
[19] |
史玉升, 张李超, 白宇, 等.3D打印技术的发展及其软件实现[J].中国科学:信息科学, 2015, 45(02): 197-203. |
Metrics
- PDF Downloads(72)
- Abstract views(3148)
- HTML views(2220)