Citation: Chen Qian, Wei Zhangjun, Xu Chengyu. Guangzhou Metro Lines 18 and 22 Based on BIM Project Management Platform Research and Application. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(6): 109-117. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.18
2020, 12(6): 109-117. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.18
Guangzhou Metro Lines 18 and 22 Based on BIM Project Management Platform Research and Application
1. | China Railway Construction South China Construction Co., Ltd., Guangzhou 511458, China |
2. | China Railway 25th Bureau Group Co., Ltd., Guangzhou 511458, China |
In recent years, the application of BIM and Internet of Things technology has improved the information level of engineering projects. The application of single solution such as 4D simulation, collision check and face recognition are relatively mature, but we still face difficulties in the landing especially the application of BIM. The management concepts and methods have not been changed, and there are not many applications that really deep into the construction work surface. The project management system and BIM technologies are less integrated. This paper has combined the actual project general contracting management mode of Guangzhou Metro Lines 18 and 22 and the actual demands of the participating parties to develop a BIM-based project management platform, which is applied to the entire line of 18 and 22 lines. The project implementation phase, from the development of intelligent design plug-ins to the refined project management application in the construction phase, to the final digital handover. The practice shows that the research has achieved the collection and sharing of engineering data, drives the project management with data analysis, achieve the information coordination of the project participants, reduces the communication cost of all parties that have been involved in the construction, and makes the general contract management establish in real, real-time, effective and above the number of correlations. Therefore, the level of scientific management in the process of subway construction has been improved.
[1] |
廖羚, 莫专恒, 杨磊, 等. BIM技术在南宁轨道交通3号线创业路站的机电工程施工研究应用[J].土木建筑工程信息技术, 2019, 11(5): 7-18. |
[2] |
罗平, 王辉, 高银鹰, 等.北京地铁19号线BIM总体管理体系研究及在典型工点的示范应用[J].土木建筑工程信息技术, 2018, 10(5): 38-45. |
[3] |
杨国华, 刘春艳.轨道交通项目BIM+GIS云平台建设研究[J].土木建筑工程信息技术, 2017, 9(2): 103-106. |
[4] |
陈前, 张伟忠, 王玮. BIM技术在城市轨道交通建设工程质量与安全管理中的落地应用[C].第二届全国BIM学术会议, 2016, 5. |
[5] | |
[6] |
GB/T 51301-2018.建筑信息模型设计交付标准[S]. |
[7] |
GB/T 51212-2016.建筑信息模型应用统一标准[S]. |
[8] |
GB/T 51269-2017.建筑信息模型分类和编码标准[S]. |
[9] |
GB/T 51235-2017.建筑信息模型施工应用标准[S]. |
[10] |
清华大学软件学院BIM课题组.中国建筑信息模型标准框架研究[J].土木建筑工程信息技术, 2010, 2(2): 1-5.doi: 10.3969/j.issn.1674-7461.2010.02.001 |
[11] |
GB/T 51235-2017.工业基础类平台规范[S]. |
[12] |
Metrics
- PDF Downloads(42)
- Abstract views(2050)
- HTML views(2032)