Citation: Hu Huan, Guo Kongxu. Analysis on BIM Application in Medical Logistics Trolley System of Internal Medicine Building Project of Shenzhen People′s Hospital. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(6): 118-122. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.19
2020, 12(6): 118-122. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.19
Analysis on BIM Application in Medical Logistics Trolley System of Internal Medicine Building Project of Shenzhen People′s Hospital
1. | CRRC Information Technology Co., Ltd., Beijing 100084, China |
2. | Bureau of Public Works of Shenzhen Municipality, Shenzhen 518000, China |
This paper summarizes the gain and loss of implementing BIM technology application in practice of the internal medicine building project of Shenzhen People's Hospital. Referring to the design method of rail transit industry, this paper proposes the concept of gauge design, and adopts the method of BIM aided design in the design method and steps for medical logistics track car system. Also, the paper puts forward the development of model and the design method under different LOD levels in the process of BIM aided design.
[1] |
本书编委会.中国医院建设指南(第三版)[M].北京:中国标准出版社, 2015. |
[2] | |
[3] |
孙昱, 谌红杰, 刘文尧. BIM技术在中南大学湘雅五医院项目中的应用[J].土木建筑工程信息技术, 2018, 10(5). |
[4] |
CJJ/T-96-2018, 地铁限界标注[S]. |
[5] | |
[6] |
GB/T51235-2017, 建筑信息模型施工应用标准[S]. |
[7] |
杨科, 康登泽, 车传波, 等.基于BIM的碰撞检查在协同设计中的研究[J].土木建筑工程信息技术, 2013, 5(4): 71-75, 98. |
[8] | |
[9] |
深圳市建筑工务署.医用物流传输系统设计技术指引[OL].http://szwb.sz.gov.cn/interaction/zjdc/erzjdc/content/post_3614113.html. |
[10] |
刘鹏辉.地铁限界检查方法分析[J].建筑工程技术与设计, 2016(15):1531-1531. |
Metrics
- PDF Downloads(29)
- Abstract views(2427)
- HTML views(1569)