2020, 12(6): 49-58. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.09
EPC模式下BIM全过程实践——以南京江北新区人才公寓(一号地块)为例
南京长江都市建筑设计股份有限公司,南京 210002 |
Practice on BIM Full Lifecycle Implementation in EPC Mode——Taking Project of Jiangbei New District Talent Apartment (No.1 Plot) in Nanjing as an Example
Nanjing Yangtze River Urban Architectural Design Co., Ltd., Nanjing 210002, China |
引用本文: 汤昱泽, 孙昱晨, 于江, 唐觉民. EPC模式下BIM全过程实践——以南京江北新区人才公寓(一号地块)为例[J]. 土木建筑工程信息技术, 2020, 12(6): 49-58. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.09
Citation: Tang Yuze, Sun Yuchen, Yu Jiang, Tang Juemin. Practice on BIM Full Lifecycle Implementation in EPC Mode——Taking Project of Jiangbei New District Talent Apartment (No.1 Plot) in Nanjing as an Example[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(6): 49-58. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.09
摘要:南京江北新区人才公寓(一号地块)项目是南京江北新区第一个以设计为龙头的EPC管理项目。该项目在设计和施工中采用BIM协同平台、5D平台为核心工具,并集成多项专项技术,实践了从设计到建造的全过程BIM应用。本文通过对EPC模式下,BIM应用优势和特点的梳理和挖掘,总结项目BIM全过程管理的经验与教训,为提升BIM全过程管理效率和虚拟建造项目技术质量,实现绿色、健康、智慧的百年建筑目标做出了有益的探索。
Abstract: The Jiangbei new district talent apartment (No.1 plot) project in Nanjing is the first EPC management project with an architecture design firm as the leading role in the Jiangbei new area, Nanjing. The project applies both the BIM collaborative platform and the 5D platform as the core tools in the design and construction stages, and integrates a number of special technologies to realize the whole progress BIM application from design to construction. This paper sorts out and mines the advantages and characteristics of BIM application under EPC mode, and summarizes the experience and lessons of BIM application for whole process management in the project, which has made a useful exploration for improving the whole process management efficiency of BIM and the technical quality of virtual construction project, achieving the goal of green, healthy and intelligent centenary building.
[1] |
GB/T51301-2018, 建筑信息模型设计交付标准[S].北京: 中国建筑工业出版社, 2018. |
[2] |
方榕.城市新区生活性街道的塑造与管控策略——以南京江北新区国际健康城城市设计为例[A].中国城市规划学会、杭州市人民政府.共享与品质——2018中国城市规划年会论文集(07城市设计)[C].中国城市规划学会、杭州市人民政府: 中国城市规划学会, 2018: 9. |
[3] | |
[4] | |
[5] | |
[6] |
王淑嫱, 周启慧, 田东方.工程总承包背景下BIM技术在装配式建筑工程中的应用研究[J].工程管理学报, 2017, 31(6): 39-44. |
[7] |
王晖. BIM技术在装配式建筑中的应用研究[J].建筑工程技术与设计, 2017(1):944.doi: 10.3969/j.issn.2095-6630.2017.01.905 |
[8] |
曾卫军, 张亮亮, 闫茂林, 等.东土城路5号科研楼项目——基于EPC模式的BIM技术应用[J].土木建筑工程信息技术, 2018, 10(6): 69-77. |
[9] |
张建平, 余芳强, 李丁.面向建筑全生命期的集成BIM建模技术研究[J].土木建筑工程信息技术, 2012(1): 6-14. |
[10] |
黄锰钢, 王鹏翊. BIM在施工总承包项目管理中的应用价值探索[J].土木建筑工程信息技术, 2013, 5(5): 88-91. |
[11] |
杨国华, 刘春艳.设计企业BIM协同设计云平台建设案例研究[J].土木建筑工程信息技术, 2017(1): 100-104. |
[12] |
潘多忠. BIM技术在工程全过程精细化项目管理中的应用[J].土木建筑工程信息技术, 2014, 6(4): 49-54. |
计量
- PDF下载量(56)
- 文章访问量(2561)
- HTML全文浏览量(2022)