• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Su Ming, Cao Ligang, Tan Wu. Are We in the Lead or Backward in Terms of the BIM Mechanical & Electrical Application?. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(2): 96-100.

2013, 5(2): 96-100.

Are We in the Lead or Backward in Terms of the BIM Mechanical & Electrical Application?

1. 

China Construction First Group The Second Construction Co., Ltd., Beijing 102600, China

2. 

China Construction Five Group The Third Construction Co., Ltd., Beijing 400012, China

Web Publishing Date: 2013-04-01

[1]

何关培主编. 《中国工程建设BIM应用研究报告(2011)》. 中国房地产协会商业地产专业委员会.

[2]

应宇垦, 王婷.探讨BIM应用对工程项目组织流程的影响[J].土木建筑工程信息技术, 2012, 4(2):52-55. 

[3]

何关培等. 《BIM总论》. 中国建筑工业出版社.

[4]

建立企业级BIM生产力需要哪些BIM专业应用人才[J]. 土木建筑工程信息技术, 2012, 4(1): 57-60.

[5]

《中建一局集团第二建筑有限公司管理制度汇编》

[6]

熊诚.BIM技术在PC住宅产业化中的应用[J].住宅技术, 2012, 06:17-20. 

[7]

何关培. 中国工程建设BIM应用研究报告, 2011.

[8]

李恒, 郭红领, 黄庭等.推进中国住宅工业化进程的关键技术[J].土木建筑工程信息技术, 2009(2):15-22. 

[9]

邱闯.基于建筑信息模型(BIM)的工程建设管理革命[J].联合建设管理先锋, 2011(1). 

[10]

丁士昭.建设工程信息化导论[M].中国建筑工业出版社, 2005.

Metrics
  • PDF Downloads(12)
  • Abstract views(1341)
  • HTML views(751)
Catalog

Figures And Tables

Are We in the Lead or Backward in Terms of the BIM Mechanical & Electrical Application?

Su Ming, Cao Ligang, Tan Wu

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn