Citation: Rui Xue, Mei Jun, Yao Yong, Deng Yongjun, Wang Mingming, Hu Bo. Research on Information Quality Evaluation Method of BIM-Based Construction Management Platform. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(2): 74-80. doi: 10.16670/j.cnki.cn11-5823/tu.2020.02.12
2020, 12(2): 74-80. doi: 10.16670/j.cnki.cn11-5823/tu.2020.02.12
Research on Information Quality Evaluation Method of BIM-Based Construction Management Platform
1. | School of Civil Engineering and Architecture, Southwest University of Science and Technology, Mianyang 621010, China |
2. | Chengdu Development Center of Science and Technology, Chengdu 610207, China |
3. | Shanghai Luban Engineering Consulting Co., Ltd., Shanghai 200092, China |
In order to maximize the value of BIM-based construction management platform, this paper studies the quantitative evaluation of platform information quality based on the current development of BIM-based construction management platform. Through analyzing and selecting the evaluation elements, designing the evaluation level, and using AHP to establish evaluation model, this paper puts forward an evaluation method on information quality of the BIM-based construction management platforms. The evaluation method has been applied in the management based on BIM construction management platform of the construction project of Jiuzhaigou-Mianyang Expressway in Sichuan Province. The evaluation results quantitatively reflect the quality of information input by each unit of the platform, and indirectly improve the quality of platform information, which verifies the effectiveness of the evaluation method.
[1] |
陈丽娟, 骆汉宾, 辛宏妍.基于BIM的大型博览项目全寿命周期管理平台开发与应用[J].土木工程与管理学报, 2015, 32(3): 54-61.doi: 10.3969/j.issn.2095-0985.2015.03.011 |
[2] |
马少雄, 李昌宁, 徐宏, 等.基于BIM技术的大跨度桥梁施工管理平台研发及应用[J].图学学报, 2017, 38(3): 439-446. |
[3] |
魏晨康, 徐汉涛, 郑承红, 等.基于施工总承包管理的BIM协同信息管理平台开发及探索[J].施工技术, 2017, 46(22): 1-4. |
[4] |
王广斌, 张洋, 姜阵剑, 等.建设项目施工前各阶段BIM应用方受益情况研究[J].山东建筑大学学报, 2009, 24(5): 438-442+459.doi: 10.3969/j.issn.1673-7644.2009.05.012 |
[5] |
Ju Gao, Martin Fischer.Framework and case studies comparing implementations &impacts of 3D/4D modeling across projects[R]//CIFE Technical Report #TR172, 2008. |
[6] |
刘洪磊, 宋久乐, 王广斌, 等. BIM使用者满意度及其影响因素研究[J].土木工程学报, 2019, 52(2): 118-128. |
[7] | |
[8] |
秦旋, MANCINI, Mauro, 等.基于市场推广视角的BIM技术采纳障碍因素中意对比研究[J].管理学报, 2016, 13(11): 1718-1727.doi: 10.3969/j.issn.1672-884x.2016.11.017 |
[9] |
潘佳怡, 赵源煜.中国建筑业BIM发展的阻碍因素分析[J].工程管理学报, 2012, 26(1): 6-11.doi: 10.3969/j.issn.1674-8859.2012.01.002 |
[10] |
丰景春, 赵颖萍.建设工程项目管理BIM应用障碍研究[J].科技管理研究, 2017, 37(18): 202-209.doi: 10.3969/j.issn.1000-7695.2017.18.032 |
[11] |
AZHAR S.Building Information Modeling(BIM):Trends, Benefits, Risks, and Challenges for the AEC Industry[J]. Leardership and Management in Engineering, 2011, 11(3): 241-252.doi: 10.1061/(ASCE)LM.1943-5630.0000127 |
[12] |
苏为华.多指标综合评价理论与方法问题研究[D].厦门大学, 2000. |
[13] |
戴钧陶.现代管理评价技术[M].北京:机械工业出版社, 1994. |
[14] |
甘英, 李剑桥编著.信息源与信息收集[M].山东教育出版社, 1995. |
[15] |
王萍.考核与绩效管理[M].长沙:湖南师范大学出版社.2007. |
Metrics
- PDF Downloads(31)
- Abstract views(2173)
- HTML views(1046)